>Back then there was no SMF timing for
system tasks. I suspect that despite the name SYST has nothing to do
with whether a started task is a system task, and only controls
timing.

Then along came MVS SP1.1 (affectionately known as SP1).
We capacity types spent aeons determining what it meant when system tasks were 
recorded under type 30 interval, along with anything running with TIME=1440.
Both weren't before that.

-
-teD

I’m an enthusiastic proselytiser of the universal panacea I believe in!

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to