"This si probably covered in the PTF, but the SHELLSCR ones sometimes have to 
be applied one at a time in the order that they require.
You can search the problem records and it will tell you about it.  It's dumb, 
but required sometimes."


I hit this a long while back, and here's what I found.... 

    GIM24608E ** SHELLSCR ENTRY BBLS1803 IS NEEDED TO PROCESS HFS
    BBL18003 FOR SYSMOD yourmissingPTF, BUT SHELLSCR BBLS1803 IS NOT IN
    THE SZMR0G ZONE.
GIM22601I APPLY PROCESSING FAILED FOR SYSMOD UI65815.
LOCAL FIX:
    Apply the PTF by itself with NO Groupextend and then Apply the
    remaining PTF's needed from the original Apply.
APPLY S(yourmissing PTF)
    BYPASS(HOLDSYSTEM)
    CHECK.
SMP/E APAR IO27985 has been created to address this issue.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to