Ditto what Keith says about leverage and mechanical advantage.  All things 
being equal, mid-boom sheet gives you half or 1/3 as much mechancial advantage 
as end-of-boom sheeting.  

Most C27's have 4:1 for end of boom sheeting, which is still a handful for most 
men when beating upwind in high wind, IMO.  (I personally like 6:1 end-boom 
sheeting for short handed sailing upwind).  For mid-boom sheeting, you'd want 
something significantly higher than 4:1.


Because I'm no gorilla and I'm lazy, I chose a Harken System 332.  (see the 
attached jpg) for my end of boom sheeting.  It's a two speed (6:1 and 3:1)  
hexarachet system, with a continuous (loop) mainsheet.  I use the 6:1 for 
trimming upwind, and the 3:1 for trimming downwind.  6:1 is a lot of sheet to 
haul when gybing so the  3:1 is perfect for that or for light wind trimming.  
(The only drawback is that it's a lot of sheet in the cockpit)

The hexarachet feature increases the holding power of the block by about 10 
times, so I don't need a winch to trim when beating upwind in heavy weather.  I 
can trim with one hand and steer with the other upwind with ease.    Making it 
easy really improves my sail handlig skills!

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Bill Smith already mentioned the importance of safe working loads...  ditto on 
that.  

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
One more thing to consider in addition to safe working 
loads:  bearing engineering  The bearings on your old mainsheet blocks may be 
shot or may simply be the wrong kind for a mainsheet

Different blocks are designed to handle different kinds of loads.  Halyard 
blocks are designed to handle high static loads for a long time without 
deforming.   Blocks that handle free running lines are designed to minimize 
friction and to run freely under load.   They're engineered differently.  

For a mainsheet, you want a block designed for low friction under high dynamic 
loading.
Below are some notes on block sprecification from my C27 deck layout page at 

http://www.blumhorst.com/catalina27/RiggingDesign.htm

Fair winds,
Judy B
Safe Working Loads:
There is a program on Harken's website that calculates the required strength of 
each piece of hardware, given the specifications for you boat. You can go to 
Harken's CompuSpec program, select your boat (in my case, a Catalina 27) and 
get a report on the loads on all the lines on the boat. The program will 
interactively recommend blocks and other hardware with the correct safe working 
load for specific applications (mainsheet, turning blocks, winches, etc). You 
can look up the specifications for each recommended block, to see how strong a 
block you'll need, based on the application and the angle of deflection of the 
line.
Match the Bearings to the Application
There is one more important thing to consider besides the safe working load of 
a block: that's the type of bearing. You can't always safely substitute one 500 
pound block for another 500 pound block. Blocks that must survivelarge static 
loads require special bearings that won't deform under a constant load. 
Examples of these are blocks for the main halyard and jib halyard . Other 
blocks must have bearings that will release quickly and run friction free under 
heavy load, such as the mainsheet. 
Not all bearings are the same!!!! You may buy a cheaper block that's strong 
enough according to the required safe working load, but if the bearings don't 
perform properly for the application or won't hold up to a standing static 
load, you're just wasting your money




________________________________
From: "Sneddon, Keith - ES/IS" <[email protected]>
To: "[email protected]" <[email protected]>
Sent: Thursday, June 11, 2009 8:20:18 AM
Subject: RE: [IC27A] Main sheet trim





This all comes down to the physics. To trim your main, you have to pull against 
a force (the lateral force on the main) through a distance (the angle the boom 
moves). The product of force times distance is work. When you pull on the end 
of the boom, you are pulling the same angle to achieve proper flow, but the 
point you are pulling on is moving a lot farther than if you have mid-boom 
sheeting. To do the same amount of work, you don’t need to pull as hard. To put 
some rough numbers to it, if you pull at the mid span of the boom, you have to 
pull twice as hard for half the distance. To get back to a reasonable pull 
force, you can add purchase (8:1 vs. 4:1 pulley setup, for example) to trade 
back distance for force. Nothing is ever free, however, and each layer of 
purchase adds drag, which hurts in both directions (sheeting in and out). Big 
sheet tension hurts drag too, as the frictional force is directly proportional 
to the sheet tension.
For this, and a bunch of other reasons, end boom sheeting is mechanically more 
efficient, but Sailboat Design, like life, is a series of compromises and 
imperfect solutions. There are a lot of practical advantages to mid-boom 
sheeting.
 
Keith Sneddon
#4760, “Are We There Yet?”

________________________________

From:ic...@yahoogroups. com [mailto: ic...@yahoogroups. com ] On Behalf Of Tim 
Millar
Sent: Thursday, June 11, 2009 10:49 AM
To: ic...@yahoogroups. com
Subject: Re: [IC27A] Main sheet trim
 




Jeff,
 
I have the same original setup on our 1986 and agree that it can be difficult. 
Hope we can get an explanation and solution.
 
Tim
Sea Scout Ship 76
Spirit, #6254
 
 
On Jun 11, 2009, at 10:29 AM, jlenox225 wrote:

 
I searched the forum and did not find any other posts regarding this issue. 
Does anyone else have trouble trimming and easing their main. I have mid boom 
sheeting to the original cabin top traveler. I find that the sheet binds up 
when I try to ease it under load and I need to assist it by feeding line from 
where the sheet enters the aft most block on the boom. When sailing to weather 
it seems like there is a significant load on the sheet when trimming which 
requires the use of the winch handle. I would even say that with the sails 
down, to fully sheet the boom amidships it feels a bit tight. It would seem 
that it binds somewhere in the turns from the winch to the turningblocks on 
deck to the 3 blocks which redirect the sheet to the traveler. I found that I 
had the same problem on my S2 27 which had a similar set up. It appears by 
looking at other C27s that this is the standard set up. I hope I explained this 
in a not too confusing manner.
Thanks,
Jeff 
 
________________________________
This e-mail and any files transmitted with it may be proprietary and are 
intended solely for the use of the individual or entity to whom they are 
addressed. If you have received this e-mail in error please notify the sender.
Please note that any views or opinions presented in this e-mail are solely 
those of the author and do not necessarily represent those of ITT Corporation. 
The recipient should check this e-mail and any attachments for the presence of 
viruses. ITT accepts no liability for any damage caused by any virus 
transmitted by this e-mail.

Reply via email to