Yesterday was the first time I was able to get out and get the sails up after 
10 months of work on my 79 C27. I have a few questions about the rig - and 
posted a few pics here:

http://www.opus45.com/c27rig/

1. I might have some issues with halyard length. The headsail halyard seems to 
be to long - by the time I get it down to the winch I am on steel, no rope 
left. Does the headsail halyard run through a block on the deck first?

2. Any guidance on placement of the genoa sheet cars on the track? The sail is 
a 150.

3. What is the steel cable with the clasp dangling from the backstay?

4. I assume that its normal that the genoa hits the front pulpit a bit?

5. Is it the Spinnaker halyard that runs through the block on the base of the 
mast and back to the cockpit? or is that the link for the spinnaker pole?

Thanks for the info.

Derek A.
#4297



      

Reply via email to