Adam Saghy created FINERACT-2520:
------------------------------------
Summary: Loan charges are missed at disbursement
Key: FINERACT-2520
URL: https://issues.apache.org/jira/browse/FINERACT-2520
Project: Apache Fineract
Issue Type: Bug
Affects Versions: 1.14.0
Reporter: Adam Saghy
Assignee: Adam Saghy
You’ll need a loan charge, %Amount, due at specific date.
You’ll either add the charge to the loan *product* or to the loan account
before approval/disbursement.
Steps to reproduce:
# Create a loan with the above charge added.
# The loan must have *progressive* repayment schedule
# Disburse the loan
Expected result:
* the loan has the charges calculated and added
Actual result:
* loan misses the charges already added
Note: it works correctly with cummulative loans.
*Acceptance criteria*
* Disbursement charges can be applied to progressive loans
--
This message was sent by Atlassian Jira
(v8.20.10#820010)