[ 
https://issues.apache.org/jira/browse/FLINK-20509?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

godfrey he updated FLINK-20509:
-------------------------------
    Description: 
 Currently, we use {{verifyPlan}} method to verify the plan result for both 
{{RelNode}} plan and {{ExecNode}} plan, because their instances are the same. 
But once the implementation of {{RelNode}} and {{ExecNode}} are separated, we 
can't get {{ESTIMATED_COST}} and {{CHANGELOG_MODE}} on {{ExecNode}} plan. So in 
order to make those methods more clear, we will introduce {{verifyRelPlan}} and 
{{verifyExecPlan}} to check 

the {{verifyPlan}} method will be separated into two methods, {{verifyRelPlan}} 
for verifying the {{RelNode}} plan, and {{verifyExecPlan}} for verifying the 
{{ExecNode}} plan. 

  was: Currently, we use {{verifyPlan}} method to verify the plan result for 
both {{RelNode}} plan and {{ExecNode}} plan, because their instances are the 
same. But once the implementation of {{RelNode}} and {{ExecNode}} are 
separated, we can't get {{ESTIMATED_COST}} and {{CHANGELOG_MODE}} on 
{{ExecNode}} plan. So in order to make those methods more clear, the 
{{verifyPlan}} method will be separated into two methods, {{verifyRelPlan}} for 
verifying the {{RelNode}} plan, and {{verifyExecPlan}} for verifying the 
{{ExecNode}} plan. 


> Refactor verifyPlan method in TableTestBase
> -------------------------------------------
>
>                 Key: FLINK-20509
>                 URL: https://issues.apache.org/jira/browse/FLINK-20509
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Table SQL / Planner
>            Reporter: godfrey he
>            Assignee: godfrey he
>            Priority: Major
>              Labels: pull-request-available
>
>  Currently, we use {{verifyPlan}} method to verify the plan result for both 
> {{RelNode}} plan and {{ExecNode}} plan, because their instances are the same. 
> But once the implementation of {{RelNode}} and {{ExecNode}} are separated, we 
> can't get {{ESTIMATED_COST}} and {{CHANGELOG_MODE}} on {{ExecNode}} plan. So 
> in order to make those methods more clear, we will introduce 
> {{verifyRelPlan}} and {{verifyExecPlan}} to check 
> the {{verifyPlan}} method will be separated into two methods, 
> {{verifyRelPlan}} for verifying the {{RelNode}} plan, and {{verifyExecPlan}} 
> for verifying the {{ExecNode}} plan. 



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to