[
https://issues.apache.org/jira/browse/HBASE-14712?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14979301#comment-14979301
]
Matteo Bertozzi commented on HBASE-14712:
-----------------------------------------
let me look at this maybe something changed recently, but in general you should
have just 1 log, or couple of them if you are hammering the master with admin
ops
> MasterProcWALs never clean up
> -----------------------------
>
> Key: HBASE-14712
> URL: https://issues.apache.org/jira/browse/HBASE-14712
> Project: HBase
> Issue Type: Bug
> Reporter: Elliott Clark
> Priority: Blocker
>
> MasterProcWALs directory grows pretty much un-bounded. Because of that when
> master failover happens the NN is flooded with connections and everything
> grinds to a halt.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)