[ 
https://issues.apache.org/jira/browse/HBASE-14712?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14979301#comment-14979301
 ] 

Matteo Bertozzi commented on HBASE-14712:
-----------------------------------------

let me look at this maybe something changed recently, but in general you should 
have just 1 log, or couple of them if you are hammering the master with admin 
ops

> MasterProcWALs never clean up
> -----------------------------
>
>                 Key: HBASE-14712
>                 URL: https://issues.apache.org/jira/browse/HBASE-14712
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Elliott Clark
>            Priority: Blocker
>
> MasterProcWALs directory grows pretty much un-bounded. Because of that when 
> master failover happens the NN is flooded with connections and everything 
> grinds to a halt.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to