[
https://issues.apache.org/jira/browse/HBASE-14712?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14979427#comment-14979427
]
Elliott Clark commented on HBASE-14712:
---------------------------------------
The CI cluster can't even get loaded and you can't get on it.
That's a jstack from a different production cluster with 200+ logs. (So seeing
the same issues.)
> MasterProcWALs never clean up
> -----------------------------
>
> Key: HBASE-14712
> URL: https://issues.apache.org/jira/browse/HBASE-14712
> Project: HBase
> Issue Type: Bug
> Reporter: Elliott Clark
> Assignee: Matteo Bertozzi
> Priority: Blocker
>
> MasterProcWALs directory grows pretty much un-bounded. Because of that when
> master failover happens the NN is flooded with connections and everything
> grinds to a halt.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)