[ 
https://issues.apache.org/jira/browse/HBASE-14712?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14979427#comment-14979427
 ] 

Elliott Clark commented on HBASE-14712:
---------------------------------------

The CI cluster can't even get loaded and you can't get on it.
That's a jstack from a different production cluster with 200+ logs. (So seeing 
the same issues.)

> MasterProcWALs never clean up
> -----------------------------
>
>                 Key: HBASE-14712
>                 URL: https://issues.apache.org/jira/browse/HBASE-14712
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Elliott Clark
>            Assignee: Matteo Bertozzi
>            Priority: Blocker
>
> MasterProcWALs directory grows pretty much un-bounded. Because of that when 
> master failover happens the NN is flooded with connections and everything 
> grinds to a halt.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to