[
https://issues.apache.org/jira/browse/HBASE-14712?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14979491#comment-14979491
]
Elliott Clark commented on HBASE-14712:
---------------------------------------
The jstacks are from another cluster that's able to load up the master. However
it also is seeing the same issue. Most of my production clusters have days of
master procedure logs.
The ci cluster is so far gone that I can't ssh into it right now :-/
> MasterProcWALs never clean up
> -----------------------------
>
> Key: HBASE-14712
> URL: https://issues.apache.org/jira/browse/HBASE-14712
> Project: HBase
> Issue Type: Bug
> Reporter: Elliott Clark
> Assignee: Matteo Bertozzi
> Priority: Blocker
> Attachments: state.tar.gz
>
>
> MasterProcWALs directory grows pretty much un-bounded. Because of that when
> master failover happens the NN is flooded with connections and everything
> grinds to a halt.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)