[ 
https://issues.apache.org/jira/browse/HBASE-14460?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15062719#comment-15062719
 ] 

stack commented on HBASE-14460:
-------------------------------

In backchannel discussion with [~eclark], he makes good argument that this 
constrained, faster Increment -- one that breaks if Put and Increment address 
the same Cell -- should be an option you have to turn on since it undoes our 
strong consistency on row story, if only in an extreme, isolated case. He 
double-downed with this would be a change on a patch release... so, yeah, let 
me make this behavior something you have to turn on.

So, let me work up a patch that is for Increment only for branch-1 that needs 
to be enabled and that is clear on the pros and cons. Meantime, keep the great 
feedback coming. Thanks.

> [Perf Regression] Merge of MVCC and SequenceId (HBASE-HBASE-8763) slowed 
> Increments, CheckAndPuts, batch operations
> -------------------------------------------------------------------------------------------------------------------
>
>                 Key: HBASE-14460
>                 URL: https://issues.apache.org/jira/browse/HBASE-14460
>             Project: HBase
>          Issue Type: Bug
>          Components: Performance
>            Reporter: stack
>            Assignee: stack
>            Priority: Critical
>         Attachments: 0.94.test.patch, 0.98.test.patch, 
> 1.0.80.flamegraph-7932.svg, 14460.txt, 98.80.flamegraph-11428.svg, 
> HBASE-14460-discussion.patch, client.test.patch, 
> flamegraph-13120.svg.master.singlecell.svg, flamegraph-26636.094.100.svg, 
> flamegraph-28066.098.singlecell.svg, flamegraph-28767.098.100.svg, 
> flamegraph-31647.master.100.svg, flamegraph-9466.094.singlecell.svg, 
> hack.flamegraph-16593.svg, hack.uncommitted.patch, m.test.patch, 
> region_lock.png, testincrement.094.patch, testincrement.098.patch, 
> testincrement.master.patch
>
>
> As reported by 鈴木俊裕 up on the mailing list -- see "Performance degradation 
> between CDH5.3.1(HBase0.98.6) and CDH5.4.5(HBase1.0.0)" -- our unification of 
> sequenceid and MVCC slows Increments (and other ops) as the mvcc needs to 
> 'catch up' to our current point before we can read the last Increment value 
> that we need to update.
> We can say that our Increment is just done wrong, we should just be writing 
> Increments and summing on read, but checkAndPut as well as batching 
> operations have the same issue. Fix.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to