[
https://issues.apache.org/jira/browse/TEZ-2581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14980181#comment-14980181
]
Jeff Zhang edited comment on TEZ-2581 at 10/29/15 10:04 AM:
------------------------------------------------------------
bq. TezEventUpdaterTransition - we could accumulate events and then write them
upon finish once - any downsides to that?
The only concern is memory consumption. But after second thought, we will
always keep the TezEvents in memory for downstream consumption, so I think
accumulating them should be OK.
bq. Can we check that the post recovery value of various times like
startTime/launchTime/finishTime etc. remain at their pre recovery values?
I plan to add more tests to verify the new state machine transition for
recovery. Will put the time checking in these unit tests.
was (Author: zjffdu):
bq. Can we check that the post recovery value of various times like
startTime/launchTime/finishTime etc. remain at their pre recovery values?
I plan to add more tests to verify the new state machine transition for
recovery. Will put the time checking in these unit tests.
> Umbrella for Tez Recovery Redesign
> ----------------------------------
>
> Key: TEZ-2581
> URL: https://issues.apache.org/jira/browse/TEZ-2581
> Project: Apache Tez
> Issue Type: Improvement
> Reporter: Jeff Zhang
> Assignee: Jeff Zhang
> Attachments: TEZ-2581-WIP-1.patch, TEZ-2581-WIP-2.patch,
> TEZ-2581-WIP-3.patch, TEZ-2581-WIP-4.patch, TEZ-2581-WIP-5.patch,
> TEZ-2581-WIP-6.patch, TezRecoveryRedesignProposal.pdf,
> TezRecoveryRedesignV1.1.pdf
>
>
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)