On 21/12/2014 03:07, DON wrote:
> Question:  How is this feature supposed to handle assignment of
> Master Sources to To-Do Items?
>
> I sometimes assign Master Sources to To-Do Items as well as
> Individuals.  The listing correctly includes Individuals but does not
> include the To-Do item.
>
> If a Master Source is not assigned to any individuals, a message
> window is shown that says: "This source is attached to a General
> To-Do Item called:  ... "
>
> I used Legacy 7 until recently and now am using Legacy 8.  I
> experienced this same behavior in both versions.
>
> Any thoughts?  Am I missing a configuration setting somewhere?

I think the problem is that when you attach a Source both to an
Individual and to a General To-Do you would need two message boxes to
appear - one which tells you which Individuals use the Source and one
which tells you which General To-Dos use the Source.

This is possibly not an insurmountable problem for the programmers but
perhaps something they haven't thought was needed.

If you attach a Source to an Individual To-Do, that Individual will show
up in the "using this Source list".
--
Jenny M Benson




Legacy User Group guidelines:

http://www.LegacyFamilyTree.com/Etiquette.asp

Archived messages after Nov. 21 2009:

http://www.mail-archive.com/[email protected]/

Archived messages from old mail server - before Nov. 21 2009:

http://www.mail-archive.com/[email protected]/

Online technical support: http://support.legacyfamilytree.com

Follow Legacy on Facebook (http://www.facebook.com/LegacyFamilyTree) and on our 
blog (http://news.LegacyFamilyTree.com).

To unsubscribe: http://www.LegacyFamilyTree.com/LegacyLists.asp

Reply via email to