On May 11, 2006, at 8:44 PM, John Summerfied wrote:

Adam Thornton wrote:
On May 8, 2006, at 2:19 PM, James Melin wrote:

What I've never been able to figure out is how to tell z/VM that
the backup process on z/OS is done and to either change runlevels
or IPL the guest or
what have you.

Again daily system shutdowns are not suitable for a 24/7 production
environment. So how to balance the need vs the reality is the real
trick.


"By doing file-level backups of the Linux guests" is the answer.  I'm

tar, dump or similar? What about open (eg DB2) databases?

Bacula and a Client Run Before Job directive.  For instance.

Adam

----------------------------------------------------------------------
For LINUX-390 subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: INFO LINUX-390 or visit
http://www.marist.edu/htbin/wlvindex?LINUX-390

Reply via email to