I have two timetables within the same document.

One is the main timetable which has the lecture title and a summary of
its content. The other is a summary timetable that goes on the back
page of the document, and just has the date and lecture title.

With Word I can use" Bookmarks" to auto-update the summary timetable
when I edit the main timetable. The dates are fixed so its only the
lecture titles that get edited and re-arranged.

Is there some way of doing this in Lyx.

Thanks,

Graham

Reply via email to