I have two timetables within the same document. One is the main timetable which has the lecture title and a summary of its content. The other is a summary timetable that goes on the back page of the document, and just has the date and lecture title.
With Word I can use" Bookmarks" to auto-update the summary timetable when I edit the main timetable. The dates are fixed so its only the lecture titles that get edited and re-arranged. Is there some way of doing this in Lyx. Thanks, Graham