You will have to change the type of the bus when Q hits the limits. For this monitor the Q limit and when it hits write call a function for this.
On Fri, Aug 22, 2014 at 2:07 PM, Gelli Ravikumar < [email protected]> wrote: > Dear Sir/s, > > > I have gone through core load flow programs of MatPower such as gausspf.m > and newtonpf.m. But, in these methods, I could not found any provision of > switching the PV bus to PQ bus whenever the Q limits of PV bus not met in > the duration of iterations. Please let me know your insights into it. > > > > -- > with Regards > ---------------------------------------------------- > Gelli Ravikumar > Research Scholar (Ph.D), > Field Computations Lab, > Dept. of Electrical Engineering, > IIT Bombay, Powai, Mumbai 400076 > Ph: 022-2576 4424, 089 765 983 96 > > Gandhian Young Technological Innovation Award - 2013 > POSOCO Power System Award: PPSA - 2013 > IITB PhD Executive Member - 2013-14 > IITB SARC Core Technical Member - 2014-15 > > >