You will have to change the type of the bus when Q hits the limits. For
this monitor the Q limit and when it hits write call a function for this.


On Fri, Aug 22, 2014 at 2:07 PM, Gelli Ravikumar <
[email protected]> wrote:

> Dear Sir/s,
>
>
> I have gone through core load flow programs of MatPower such as gausspf.m
> and newtonpf.m. But, in these methods, I could not found any provision of
> switching the PV bus to PQ bus whenever the Q limits of PV bus not met in
> the duration of iterations. Please let me know your insights into it.
>
>
>
> --
> with Regards
> ----------------------------------------------------
> Gelli Ravikumar
> Research Scholar (Ph.D),
> Field Computations Lab,
> Dept. of Electrical Engineering,
> IIT Bombay, Powai, Mumbai 400076
> Ph: 022-2576 4424, 089 765 983 96
>
> Gandhian Young Technological Innovation Award - 2013
> POSOCO Power System Award: PPSA - 2013
> IITB PhD Executive Member - 2013-14
> IITB SARC Core Technical Member - 2014-15
>
>
>