I believe I've seen a similar question asked before. See this link
<https://www.mail-archive.com/[email protected]/msg05398.html> which
indicates that RAMP_10 is used for reserve calculations, RAMP_30 for
dispatch scheduling, and RAMP_AGC Is not currently used by matpower
according to this link
<https://www.mail-archive.com/[email protected]/msg06231.html>.

On Thu, Mar 8, 2018 at 6:51 PM, Bainan Xia <[email protected]> wrote:

> Hi,
>
>
>
> I’m running a huge power system simulation using MOST recently. I’ve got
> some information on ‘ramp rate (% of the rated capacity per min)’ for each
> type of generator from a paper. I would like to add these constraints into
> my case. I’ve found a field in mpc.gen, called ‘RAMP_AGC’, which is ramp
> rate for load following/AGC (MW/min). I’m wondering whether that is the
> right place to fill. Or the following columns ‘RAMP_10’ and ‘RAMP_30’ are
> the right choices. I’m also a little confused on the difference between
> ‘RAMP_10’ and ‘RAMP_30’. What does the word ‘reserve’ mean in the
> documentation.
>
>
>
> Thanks for the help J
>
>
>
> Best,
>
> Bainan
>