I’ll do my best to address your questions, but please feel free to ask for 
further clarification if I don’t get them all.

Reserve zones are unrelated to either the BUS_AREA or ZONE columns in the bus 
matrix. They are defined by the mpc.reserves.zones matrix and can be 
overlapping (i.e. a given generator may be in multiple reserve zones).

The reserve prices come from the shadow prices on the reserve requirement 
constraints for the various reserve zones. The Rmin mu, Rmax mu are shadow 
prices on the lower and upper bounds on the reserve variable and the Pmax mu is 
the shadow price on the upper bound on Pg + R.

You can certainly use the BUS_AREA column in the bus matrix to define areas 
that correspond to your reserve zones if you find that useful. It is not 
necessary however, unless you want a convenient way to modify parameters (see 
scale_load() or apply_changes()) or print output summaries (see the 
out.area_sum option) by area.

Hope this helps,

   Ray


On Jan 7, 2020, at 9:26 PM, Yang 
<[email protected]<mailto:[email protected]>> wrote:

Hi, everyone!
I want to divide the 30 buses and 6 generators into 3 areas in case 30.m, in 
earlier messages, I find 'areas' don't affect the runopf(), but how in 
runopf_w_res? And what are differences between 'area' and 'zone'? After reading 
messages, I think areas are about buses and zones are about generators. Is it 
correct about my understand?

I have two questions:
First, I do some modify in in the t_case30_userfcns.m, gen1 and gen2 are in 
zone 1, gen5 and gen6 are in zone3, and gen3 and gen4 are in zone2. And every 
zone's reserve requirements are 30MW.
" OutmailID: 124252370, List: 'matpower-l', MemberID: 6449049 SCRIPT: "reserve 
zones, element i, j is 1 if gen j is in zone i, 0 otherwise
mpc.reserves.zones = [
 1 1 0 0 0 0;
 0 0 1 1 0 0;
 0 0 0 0 1 1;
];
" TCL MERGE ERROR ( 01/07/2020 23:27:02 ): "missing " reserve requirements for 
each zone in MW
mpc.reserves.req   = [30; 30; 30];

And results are:
|     Reserves                                                                 |
================================================================================
 Gen   Bus   Status  Reserves   Price
  #     #              (MW)     ($/MW)     Included in Zones ...
----  -----  ------  --------  --------   ------------------------
  1      1      1      15.12      2.00     1
  2      2      1      14.88      2.00     1
  3     22      1      25.00      4.00     3
  4     27      1       5.00      4.00     3
  5     23      1      25.00      5.50     2
  6     13      1       5.00      5.50     2
                     --------
            Total:     90.00              Total Cost: $305.99
Zone  Reserves   Price
  #     (MW)     ($/MW)
----  --------  --------
  1     30.00      2.00
  2     30.00      5.50
  3     30.00      4.00
================================================================================
|     Reserve Limits                                                           |
================================================================================
 Gen   Bus   Status  Rmin mu     Rmin    Reserves    Rmax    Rmax mu   Pmax mu
  #     #             ($/MW)     (MW)      (MW)      (MW)     ($/MW)    ($/MW)
----  -----  ------  --------  --------  --------  --------  --------  --------
  1      1      1        -        0.00     15.12     25.00       -        0.10
  2      2      1        -        0.00     14.88     25.00       -         -
  3     22      1        -        0.00     25.00     25.00      1.00       -
  4     27      1        -        0.00      5.00     25.00       -         -
  5     23      1        -        0.00     25.00     25.00      0.50       -
  6     13      1        -        0.00      5.00     25.00       -         -
                                         --------
                                Total:     90.00

And if I set every zone's reserve requirements are 20MW, the results are:
|     Reserves                                                                 |
================================================================================
 Gen   Bus   Status  Reserves   Price
  #     #              (MW)     ($/MW)     Included in Zones ...
----  -----  ------  --------  --------   ------------------------
  1      1      1      15.12      2.00     1
  2      2      1       4.88      2.00     1
  3     22      1      20.00      3.00     2
  4     27      1       0.00      3.00     2
  5     23      1      20.00      5.00     3
  6     13      1       0.00      5.00     3
                     --------
            Total:     60.00              Total Cost: $198.49
Zone  Reserves   Price
  #     (MW)     ($/MW)
----  --------  --------
  1     20.00      2.00
  2     20.00      5.00
  3     20.00      3.00
================================================================================
|     Reserve Limits                                                           |
================================================================================
 Gen   Bus   Status  Rmin mu     Rmin    Reserves    Rmax    Rmax mu   Pmax mu
  #     #             ($/MW)     (MW)      (MW)      (MW)     ($/MW)    ($/MW)
----  -----  ------  --------  --------  --------  --------  --------  --------
  1      1      1        -        0.00     15.12     25.00       -        0.10
  2      2      1        -        0.00      4.88     25.00       -         -
  3     22      1        -        0.00     20.00     25.00       -         -
  4     27      1       1.00      0.00      0.00     25.00       -         -
  5     23      1        -        0.00     20.00     25.00       -         -
  6     13      1       0.50      0.00      0.00     25.00       -         -
                                         --------
                                Total:     60.00

The prices for zones are different in the 30MW and 20MW, how do they change? 
And I'm not clear about Rmin mu, Rmax mu and Pmax mu.

And the second question is I want to divide 30 buses into 3 areas or zones, in 
corresponding with generators. I find scale_load(), and I don't know if it is 
right, and if it is necessary to do this division. Also, if it is necessary, 
how to connect them?
load_zone = zeros(30, 1);
load_zone(1:9,11,28) = 1;
load_zone(12:20,23) = 2;
load_zone(10,21,22,24:27,29,30) = 3;
opt = struct('pq', 'P', 'scale', 'QUANTITY');
dmd = [30; 30; 30];

Thanks a lot!
Yang.