Hello everyone, I have a question regarding how storages can get connected at different positions within the grid. I want to add 2 storages, one at the top of the grid and the other one at the bottom, that are connected with each other to reduce the costs of redispatch. That means if storage_1 feeds 100 MW, storage_2 should operate as a load and charge for the same amount (100 MW) and vice versa.
Is it possible to implement this dependence/ constraint in Matpower, and if so I would appreciate any advice. Thanks! R. K.
