Rene Kruessmann wrote:
Hello everyone,
I have a question regarding how storages can get connected at different
positions within the grid. I want to add 2 storages, one at the top of the
grid and the other one at the bottom, that are connected with each other
to reduce the costs of redispatch. That means if storage_1 feeds 100 MW,
storage_2 should operate as a load and charge for the same amount (100 MW)
and vice versa.
Is it possible to implement this dependence/ constraint in Matpower, and
if so I would appreciate any advice.
I am not sure that I understand what "top of the grid" and "bottom of
the grid" means here. Are you talking about chained hydroelectric
reservoirs? If so, are you considering this in the context of a
multi-period OPF, and how does the transport time between reservoirs
compares with length of the time periods in the multi-period OPF?
Carlos.