I have started in the middle of a program several times. It works best for me on a Fanuc control. Scan through the program to find where you need to restart and wright down the line N number or put a N number there. Start the program running in single block mode. Single block through the beginning of the program until you load the tool and execute the tool length and spindle speed comands. Some times I will let the control execute the first position move then I will put the control in manual mode and search through the program to the N number line in the program that has an X & Y location move of where I want to restart at. Put the control back in run mode and push start and single block through a few lines to make sure everything is alright. Take off single block and off you GO. Some times it takes a little work but I have had good luck this way. Play around with this method with the tool removed to see if it will work for you.

Good Luck.


At 07:55 AM 8/3/00 -0500, you wrote:
If have a run time of 2 hours and my cutter snaps at 1.5 hours into it how
can I start again at the point of breakage.
I have tried starting in the middle of progam before without success.

I believe it needs to see the header code to know cutter comp, fixture
offsets, feeds, speeds ect.
How can I do this...

Thanks
Jim M. "Cherry Corp"

======================================================================
To find out more about this mailing list including how to unsubscribe,
send the message "info mfg-smartcam" to [EMAIL PROTECTED]
======================================================================
======================================================================
To find out more about this mailing list including how to unsubscribe,
send the message "info mfg-smartcam" to [EMAIL PROTECTED]
======================================================================

Reply via email to