在 2015年7月22日 星期三,下午2:24,Deepak Kumar (dekumar) 写道:
> Hi, > > I have few minor comments on the draft. > > NVO3 Reference model should be updated to show operator deployment(s) where > L2 and L3 NVE are distributed across nodes and so to verify tenant end system > to tenant end system path require de-encap and re-encap of traffic in middle > nve if l3 routing is required. > > In Reference Diagram we should also highlight L3 Network can be of multiple > types and in case of ip, it can be ip unumbered which makes traceroute not > even identifying ingress interface as all interfaces share the same ip. > > Another Area requirement clarification should be done is that NVE if they are > deployed with Distributed Anycast Gateway and EVPN, Tenant End system > traceroute doesn’t provide any relevant information and this problem also > need to be solved. > > Path MTU is also very important requirement and we should also address it as > part of OAM requirement also. > > Again these requirement(s) should be May as they are not applicable for all > scenarios. Agree. Maybe controller based OAM solution should also be considered in the document. Thanks, -- Dapeng Liu > > Thanks, > Deepak > > _______________________________________________ > nvo3 mailing list > [email protected] (mailto:[email protected]) > https://www.ietf.org/mailman/listinfo/nvo3 > >
_______________________________________________ nvo3 mailing list [email protected] https://www.ietf.org/mailman/listinfo/nvo3
