在 2015年7月22日 星期三,下午2:24,Deepak Kumar (dekumar) 写道:

> Hi,
>  
> I have few minor comments on the draft.  
>  
> NVO3 Reference model should be updated to show operator deployment(s) where 
> L2 and L3 NVE are distributed across nodes and so to verify tenant end system 
> to tenant end system path require de-encap and re-encap of traffic in middle 
> nve if l3 routing is required.  
>  
> In Reference Diagram we should also highlight L3 Network can be of multiple 
> types and in case of ip, it can be ip unumbered which makes traceroute not 
> even identifying ingress interface as all interfaces share the same ip.  
>  
> Another Area requirement clarification should be done is that NVE if they are 
> deployed with Distributed Anycast Gateway and EVPN, Tenant End system 
> traceroute doesn’t provide any relevant information and this problem also 
> need to be solved.  
>  
> Path MTU is also very important requirement and we should also address it as 
> part of OAM requirement also.  
>  
> Again these requirement(s) should be May as they are not applicable for all 
> scenarios.

Agree. Maybe controller based OAM solution should also be considered in the 
document.

Thanks,
--  
Dapeng Liu

  
>  
> Thanks,  
> Deepak
>  
> _______________________________________________
> nvo3 mailing list
> [email protected] (mailto:[email protected])
> https://www.ietf.org/mailman/listinfo/nvo3
>  
>  


_______________________________________________
nvo3 mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/nvo3

Reply via email to