Hi Greg, https://tools.ietf.org/html/draft-ashwood-nvo3-oam-requirements-03
If I do search of above draft I see it has MAY requirements. Can we add requirement for Out of Band support so it can be controller driven also as MAY requirement. Thanks, Deepak From: Greg Mirsky <[email protected]<mailto:[email protected]>> Date: Thursday, September 3, 2015 at 8:28 AM To: dekumar <[email protected]<mailto:[email protected]>> Cc: "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>>, "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>> Subject: Re: [nvo3] Mail regarding draft-ashwood-nvo3-oam-requirements Hi Deepak, I believe that ALL requirements are MUST as these are requirements, not good wishes. As example, I can refer to OAM Requirements in BIER tat does include requirement to support PMTUD. Regards, Greg On Thu, Sep 3, 2015 at 8:17 AM, Deepak Kumar (dekumar) <[email protected]<mailto:[email protected]>> wrote: Hi Greg, I am talking about adding below requirement(s) in OAM requirement document so solution address all pieces of requirement. Path MTU is also very important requirement. I am asking that these requirements are acknowledged and call out as MAY so solution can work on addressing them. Thanks, Deepak From: Greg Mirsky <[email protected]<mailto:[email protected]>> Date: Thursday, September 3, 2015 at 8:07 AM To: dekumar <[email protected]<mailto:[email protected]>> Cc: "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>>, "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>> Subject: Re: [nvo3] Mail regarding draft-ashwood-nvo3-oam-requirements Hi Deepak, I think that if a document merely describes the status quo then it should not be on Standard track but Informational, Experimental or BCP. Regards, Greg On Thu, Sep 3, 2015 at 7:42 AM, Deepak Kumar (dekumar) <[email protected]<mailto:[email protected]>> wrote: Hi Greg, Nvo3 Requirement(s) should be updated to the way OAM is deployed by Operators. Operators are deploying OAM in conjunction with Controller with l2/l3 vtep split between multiple switches and also combined. As Requirement will drive the solution and standard to be usable operator deployment is important. Thanks, Deepak From: Greg Mirsky <[email protected]<mailto:[email protected]>> Date: Wednesday, July 22, 2015 at 2:11 PM To: dekumar <[email protected]<mailto:[email protected]>> Cc: "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>>, "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>> Subject: Re: [nvo3] Mail regarding draft-ashwood-nvo3-oam-requirements Hi Deepak, et. al, I think that if we agree that particular OAM mechanism is needed to monitor, report defect or troubleshoot failure, then even it may be used in one of many deployment scenarios such requirement is a MUST for NVO3 OAM but is MAY for particular OAM tool set. In other words, to support particular deployment scenario NVO3 OAM protocol MUST exist as either extension of existing OAM or new mechanism/protocol. Whether it is included, used is decision outside of the scope of the requirements document. Regards, Greg On Wed, Jul 22, 2015 at 2:24 PM, Deepak Kumar (dekumar) <[email protected]<mailto:[email protected]>> wrote: Hi, I have few minor comments on the draft. NVO3 Reference model should be updated to show operator deployment(s) where L2 and L3 NVE are distributed across nodes and so to verify tenant end system to tenant end system path require de-encap and re-encap of traffic in middle nve if l3 routing is required. In Reference Diagram we should also highlight L3 Network can be of multiple types and in case of ip, it can be ip unumbered which makes traceroute not even identifying ingress interface as all interfaces share the same ip. Another Area requirement clarification should be done is that NVE if they are deployed with Distributed Anycast Gateway and EVPN, Tenant End system traceroute doesn’t provide any relevant information and this problem also need to be solved. Path MTU is also very important requirement and we should also address it as part of OAM requirement also. Again these requirement(s) should be May as they are not applicable for all scenarios. Thanks, Deepak _______________________________________________ nvo3 mailing list [email protected]<mailto:[email protected]> https://www.ietf.org/mailman/listinfo/nvo3
_______________________________________________ nvo3 mailing list [email protected] https://www.ietf.org/mailman/listinfo/nvo3
