Hi Eric, On 5/21/07, E. Wing <[EMAIL PROTECTED]> wrote:
As for the 2.0 release schedule, Apple's WWDC (developer conference) starts June 11th. This is going to put enormous strain on me and probably other Mac developers that are attending as we need to prepare for it. Personally, targeting the end of June would be much nicer on my schedule. But if that can't be done, I would say the deadline cannot be allowed to slip past June 8th because we won't be able to work on an OSG release on the road and at the conference.
Tieing up a time which is suitable for everyone is next to impossible. If we can't get the OSX side working as sweetly as we'd like we can also go for a 2.0.1 for the beginning of July. Would it be possible to get the XCode projects in shape for under of May? I can introduce others to having write access if this would help.
If you look at our CMake wiki, there's still a lot of items on the TODO list so with the early deadline, I think a lot of those things are not going to make 2.0. One item in particular is static library building. I'm not convinced it works right because I think the library link order is wrong. (Jacob and I originally were fairly careful, but all that code has since been rewritten and put into macros so I'm not sure if it's going to work right.) But we need testers to actually find out.
Emmanuel Roche has been doing static build under Windows this week and was successful, although I'm not sure how many adjustments he made the the CMake scripts to get things working. Robert. _______________________________________________ osg-users mailing list [email protected] http://openscenegraph.net/mailman/listinfo/osg-users http://www.openscenegraph.org/
