so industrious! That looks lots better than the last batch of snaps you
posted :-)
ann
On 5/26/2018 12:21 PM, John wrote:
I finished tiling where the stove and lazy-susan base are going to
sit. I'm kind of at loose ends at the moment. The grout has to dry
over night before I can put
them back in place.
https://www.flickr.com/photos/jb_sessoms/28493525848/in/album-72157668977944438/
https://www.flickr.com/photos/jb_sessoms/42366902101/in/album-72157668977944438/
https://www.flickr.com/photos/jb_sessoms/41464590005/in/album-72157668977944438/
They have to be moved back into place before I can move the
refrigerator out of the way to pull up the floor underneath it.
It took me about a week or so, spread out over a longer period of
time. Can't work on it continuously because my strength gives out.
I have to get a plumber to come in and rotate the gas pipe and install
a shut-off valve before I can install the new gas stove I have picked
out.
https://www.flickr.com/photos/jb_sessoms/42366901711/in/album-72157668977944438/
The pipe has to be turned because it's in the way of where one of the
new base cabinets will sit. I also still have to plumb in the water
lines for the kitchen sink, but that's a job I can do myself. I could
probably do the gas pipe myself, but I'm more comfortable having a
professional come in and do it.
On 5/14/2018 17:36, John wrote:
I've been working on my kitchen for a couple of years now. Progress
has been slow, but in the last week or so I've gotten a bit of work
done.
--
PDML Pentax-Discuss Mail List
PDML@pdml.net
http://pdml.net/mailman/listinfo/pdml_pdml.net
to UNSUBSCRIBE from the PDML, please visit the link directly above and follow
the directions.