Surry Power Station wants to know if anyone has had to deal with loading failed 
fuel into NUHOMS casks specifically the 32-PTH metal matrix type? We have 
recently loaded 4 of 32 assemblies with known leakers and are experiencing 
difficulties in vacuum drying the DSC due to high levels of Kr-85. Our current 
configuration has the vacuum drying system directly discharging to the Vent 
Stack 2 ( Vent Vent), there is no let down or delay prior to the radiation 
monitor.
Thanks,
Erik

Erik Simon
Health Physics Shift Supervisor
Radiation Protection, Surry Power Station

Dominion Generation
Phone:  757-365-2672; Internal: 8-798-2672
Pager:  800-272-5643-3299; E-mail: 
[email protected]<mailto:[email protected]>




CONFIDENTIALITY NOTICE:  This electronic message contains
information which may be legally confidential and/or privileged and
does not in any case represent a firm ENERGY COMMODITY bid or offer
relating thereto which binds the sender without an additional
express written confirmation to that effect.  The information is
intended solely for the individual or entity named above and access
by anyone else is unauthorized.  If you are not the intended
recipient, any disclosure, copying, distribution, or use of the
contents of this information is prohibited and may be unlawful.  If
you have received this electronic transmission in error, please
reply immediately to the sender that you have received the message
in error, and delete it.  Thank you.

Reply via email to