> > Just unclip the header rail and lay it flat (top uppermost) on the rear > shelf. Tuck it well in towards the rear then lay the rest of the top over > it. Has worked a treat on my 2+2 at all speeds and in all weathers. Do > this and the O rings are not needed. There will be a few 2+2s on the tour > next week (mine included) in case you are near Derbyshire. > I also just did as the others did to brighten the instrument lighting. I thing the whole job took about 45 mins even with wheel attached.
Paschal -- -- You received this message because you are subscribed to the Google Groups "Quantum Owners Group" group. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/quantumowners?hl=en IMPORTANT NOTE: All information presented herewith is provided on an "As Is" basis, without warranty or the implication thereof. Neither the Quantum Owners Club nor the individuals associated with the Quantum Owners Club or in the preparation of the above information shall have any liability to any person or entity with respect to liability, loss, or damage caused or alleged to be caused directly or indirectly by the instructions contained within this or related message(s). --- You received this message because you are subscribed to the Google Groups "Quantum Owners Group" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/d/optout.
