Wrenches i have a customer that wanted to install a dpw top of pole mount for
18 sharp 180 watt panels. he installed his own pipe and even after several
reminders by me and a signed contract stating shcedule 80 8 inch steel pipe he
installed a 8 inch cast iron water main.
My dilemma is this he claims to wave my liability in this install but he has
been a very high maintnence customer and seems to forget everything we talk
about or he signs. so would you go ahead with the install or is the cast iron
going to shear off and the rack fall over?
financially i have met my obligations with the customer i can wave the labor
cost and tell him to find someone else at this point if need be i dont want to
be liable for spilling 18 panels on the ground and my insurance wouldnt cover
it as we went against dpw's recomendations
_______________________________________________
List sponsored by Home Power magazine
List Address: [email protected]
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org