Wrenches i have a customer that wanted to install a dpw top of pole mount for 
18 sharp 180 watt panels. he installed his own pipe and even after several 
reminders by me and a signed contract stating shcedule 80 8 inch steel pipe he 
installed a 8 inch cast iron water main.

My dilemma is this he claims to wave my liability in this install but he has 
been a very high maintnence customer and seems to forget everything we talk 
about or he signs. so would you go ahead with the install or is the cast iron 
going to shear off and the rack fall over?

financially i have met my obligations with the customer i can wave the labor 
cost and tell him to find someone else at this point if need be i dont want to 
be liable for spilling 18 panels on the ground and my insurance wouldnt cover 
it as we went against dpw's recomendations
_______________________________________________
List sponsored by Home Power magazine

List Address: [email protected]

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to