690.41 specifies the system grounding requirements for PV systems and
includes an exception if the system complies with 690.35 Ungrounded
Photovoltaic Power Systems. 

--
John Stimac | Corvallis, OR
Renewable Energy Associates LLC
541-754-2001 Office/Fax
[email protected]
www.renewableassociates.com

-----Original Message-----
From: RE-wrenches [mailto:[email protected]] On
Behalf Of Kirk
Sent: Tuesday, October 28, 2014 10:53
To: RE-wrenches
Subject: [RE-wrenches] Code reference request

Hi,
I'm on a jobsite without my code book. Could someone tell me where in the
code ungrounded systems do not require the inverter GEC? Basically my onsite
electrician doesn't believe me. Thanks.

Kirk Herander
VSE
_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive:
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to