Friends:
I am setting up an Optics RE system with a system that has 8 FX inverters and 3 charge controllers. I installed two Mate3s and a Flexnet-DC. I need two shunts for the Inverters because 4 are connected in one DC1000 and 4 in the other. I installed a third shunt for the PV. The inverter Mate3 and Flexnet connects into one 10 port hub and the PV Mate3 connects into another hub with the charge controllers. Do I really need the PV shunt? How is the Flexnet processing charge current if it does not know there are charge controllers? I can’t seem to find the screen where you label the charge controllers. I am used to setting these up with Radians. Am I missing something? Any help is appreciates. Because when I posed this question to Outback and got the audible equivalent to a blank stare: Thanks in advance, William Miller [image: Gradient Cap_mini] Lic 773985 millersolar.com <http://www.millersolar.com/> 805-438-5600
_______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org

