Thanks Bill,
The Quick Mount QBase product comes with two 3"x5/16" lag bolts. I plan on 
using those.
Best,Jerry Caldwell

    On Tuesday, March 6, 2018, 7:27:21 PM PST, frenergy <[email protected]> 
wrote:  
 
  
Jerry,
 
            The only thing I feel compelled to add with your decision would be 
dang sure to pre-drill AND I sure wouldn't be putting a 3/8" lag into a TJI 
flange, maybe 1/4" Simpson lags? or tech screws?
 
Bill
 
Feather River Solar Electric
 
 
 On 3/6/2018 3:57 PM, Jerry Caldwell wrote:
  
  Bill, 
  Mineral bitumen roll roofing. 2:12 slope. 
  Everyone who gave input below, thanks for the suggestions. 
  I've decided to go with the Quick Mount Q-Base product. It allows you to get 
2 lag bolts into the top chord on either side of the OSB web. 
  Cheers, Jerry Caldwell
  
     On Sunday, March 4, 2018, 1:19:51 PM PST, Chris Worcester 
<[email protected]> wrote:  
  
     We've done roof mount pv on tji's. Our engineer required 4x blocking 
installed between the tji rafters that we lag bolted into. You're not allowed 
to cut or drill/bolt into the top and bottom cords of the tji's. We also packed 
out both sides of the tji plywood webbing prior to installing the blocking. Our 
snow loads oftentimes are too high and won't allow me to screw into the plywood 
roof deck  only.  
  
  
    Chris Worcester  [email protected]  530-448-9692 on my Samsung 
Galaxy S7. 
    -------- Original message -------- From: Aaron Mandelkorn 
<[email protected]>  Date: 3/4/18 6:44 AM (GMT-08:00)  To: RE-wrenches 
<[email protected]>  Subject: Re: [RE-wrenches] TJI rafters  
   I have also used the sunmoto mounts with the multiple holes. They are called 
the AL shoe I believe.  It makes a great alternative to the DPW ez foot which 
are very expensive and take forever to receive.  We but butal mastic tape on 
the back.  Just like the ez foot.  
 
 Aaron Mandelkorn
 President / Founder
 Renewable Energy Outfitters
 www.reosolar.com
 Off Grid Depot
 www.offgridnow.com
 970-596-3744
 
       
 On Mar 3, 2018 5:54 PM, "August Goers" <[email protected]> wrote:
 
 Hi All - We tie into TJIs commonly, if you Google "TJI solar" you'll find 
manufacturer docs on how to properly lag in.  
  August  
 On Mar 2, 2018 1:24 PM, "Jerry Caldwell" <[email protected]> wrote:
 
   Dear Wrenches, 
  I have a customer with a low slope roof supported by TJI beams. Does anyone 
have experience  permitting and installing on TJIs? I'm curious if 
jurisdictions are requiring Structural Engineer stamps.  
  Since the top chord of the beams is only 1 3/8" thick should we be using 
shorter lag bolts for  these installations? It also seems that it would be 
undesirable to penetrate into the web of the beam. 
  Any advice would be appreciated here. 
  Thank you, 
  Jerry Caldwell
    
 ______________________________ _________________
 List sponsored by Redwood Alliance
 
 List Address: [email protected]. org
 
 Change listserver email address & settings:
 http://lists.re-wrenches.org/o ptions.cgi/re-wrenches-re-wren ches.org
 
 List-Archive: http://www.mail-archive.com/re [email protected] 
g/maillist.html
 
 List rules & etiquette:
 www.re-wrenches.org/etiquette. htm
 
 Check out or update participant bios:
 www.members.re-wrenches.org
 
 
 
   
 ______________________________ _________________
 List sponsored by Redwood Alliance
 
 List Address: [email protected]. org
 
 Change listserver email address & settings:
 http://lists.re-wrenches.org/ options.cgi/re-wrenches-re- wrenches.org
 
 List-Archive: http://www.mail-archive.com/ [email protected]. 
org/maillist.html
 
 List rules & etiquette:
 www.re-wrenches.org/etiquette. htm
 
 Check out or update participant bios:
 www.members.re-wrenches.org
 
 
 
      _______________________________________________
 List sponsored by Redwood Alliance
 
 List Address: [email protected]
 
 Change listserver email address & settings:
 http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
 
 List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html
 
 List rules & etiquette:
 www.re-wrenches.org/etiquette.htm
 
 Check out or update participant bios:
 www.members.re-wrenches.org
 
      
  
 _______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

 
 
 -- 
Feather River Solar Electric            
Bill Battagin, Owner
4291 Nelson St.
Taylorsville, CA 95983
530.284.7849
CA Lic 874049
www.frenergy.net 

|  | Virus-free. www.avast.com  |

 _______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

  
_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to