FD venting depends on direction of prevailing winds 

 

From: RE-wrenches [mailto:[email protected]] On Behalf 
Of Kristopher Schmid
Sent: Thursday, July 12, 2018 4:07 PM
To: RE-wrenches <[email protected]>
Subject: Re: [RE-wrenches] Solar set backs

 

I had a student tell me that firefighters are often venting through the gable 
side wall as opposed to the roof.  Can anyone confirm or deny this statement?




 

Shine On!

Kris Schmid
Legacy Solar, LLC
137 West 1st Avenue
Luck, WI 54853
www.legacysolar.com <http://www.legacysolar.com> 
715-653-4295
NABCEP Certified PV Installation Professional
Licensed Wisconsin Master Electrician
BSEE

 

On Tue, Jul 10, 2018 at 6:46 PM, <[email protected] 
<mailto:[email protected]> > wrote:

NYSERDA out of NY has reasonable amendments to the IBC for setbacks for access 
and ventilation. They clarify that the hip roof valley is 18" either side for a 
total of 36" width. 

 

 

On 2018-07-10 17:38, Wayne Irwin wrote:

Calfire code seems to be the standard being somewhat enforced as the standard 
nationwide.

Wayne Irwin,
President
License #CVC56695
State Licensed Solar Contractor
Pure Energy Solar International Inc.
[email protected] <mailto:[email protected]> 
http://PureEnergySolar.com
http://SolarChargingStation.net
352 377-6527 Office
352 336-3299 Fax


The Sun Is Always Shining!

The content of this message is Pure Energy Solar Confidential. If you are not 
the intended recipient and have received this message in error, any use or 
distribution is prohibited. Please notify me immediately by reply e-mail and 
delete this message from your computer system. Thank you.


  _____  


From: RE-wrenches <[email protected] 
<mailto:[email protected]> > on behalf of Daniel Young 
<[email protected] <mailto:[email protected]> >
Sent: Tuesday, July 10, 2018 5:25:01 PM
To: 'RE-wrenches'
Subject: Re: [RE-wrenches] Solar set backs 

 

Hey Gary,

 

Ohio Fire Code does cover this. It's a matter of if the Fire marshal in you 
project area wants to waive or alter the requirements.

 

http://codes.ohio.gov/oac/1301:7-7-06v1

 

Specifically 605.11.1.2 is for residential buildings. There is some conflict in 
terms of Hip roofs in the code there. 605.11.1.2.2 states a single 3ft path on 
one edge or another for a hip roof, but 605.11.1.2.4 states that an 18 space is 
allowed when modules are mounted on two adjacent roof planes with a hip roof.

 

With Regards,

 

Daniel Young,

NABCEP Certified PV Installation ProfessionalTM: Cert #031508-90 

 

From: RE-wrenches <[email protected] 
<mailto:[email protected]> > On Behalf Of gary easton
Sent: Monday, July 09, 2018 3:39 PM
To: RE-wrenches <[email protected] 
<mailto:[email protected]> >
Subject: [RE-wrenches] Solar set backs

 

Hello Wrenches,

What are you all seeing required as setbacks post 2017?  I am having inspectors 
vary between wanting a 3' lane at the bottom and sides to allowing the array 
down to the gutter, and from requiring between 18" and 3' at the ridge.    

 

--

Gary Easton
Appalachian Renewable Power

Stewart, Ohio 45778
NABCEP Certified Solar PV                                                       
     
T: 740-277-8498

 www.arp-solar.com <http://www.arp-solar.com> 

 


"First they ignore you. Then they laugh at you. Then they fight you. Then you 
win."


~Ghandi

 

 

_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected] 
<mailto:[email protected]> 

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm <http://www.re-wrenches.org/etiquette.htm> 

Check out or update participant bios:
www.members.re-wrenches.org <http://www.members.re-wrenches.org> 


_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected] 
<mailto:[email protected]> 

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm <http://www.re-wrenches.org/etiquette.htm> 

Check out or update participant bios:
www.members.re-wrenches.org <http://www.members.re-wrenches.org> 



 

_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to