Wrenches:


If you recall, I had asked the question: After equalizing batteries, should
I check SG before or after watering?  I performed the test I had promised
to do.  The answer is, add water first.



Here is the report on my test:  Link
<https://millersolar.com/MillerSolar/case_studies/26%20Specific_Graviity/Specific_Gravity.html>



Conclusion: Here is the proper order of steps to check Specific Gravity:

1. Verify water level in cells is above the moss-guard. Add water only to
bring water to top of moss-guard if needed.

2. Run Equalizing charge.

3. Add distilled water to all cells to bring electrolyte to recommended
level.

4. Apply bulk charge voltage to batteries for 30 minutes to mix electrolyte.

5. Test and record Specific Gravity.



It seems obvious now, but I had to test it out…



William





Miller Solar

17395 Oak Road, Atascadero, CA 93422

805-438-5600

www.millersolar.com

CA Lic. 773985
_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to