On Jun 21, 2007, at 8:56 AM, Jeff DePolo wrote: > Ground kits at top and bottom of vertical feedline run (before any > bends), > and another ground kit at the entrance port to the buildling/shelter. > Polyphasers inside the shelter mounted to the the common-point > ground bus > bar for all of the indoor equipment, with the indoor common-point > ground > tied into the site ground system using low L/C conductors (3" Cu strap > preferred, #2 AWG for short runs, avoiding right-angle bends). > > --- Jeff
Amen. You may be seated. :-) -- Nate Duehr [EMAIL PROTECTED]

