On Jun 21, 2007, at 8:56 AM, Jeff DePolo wrote:

> Ground kits at top and bottom of vertical feedline run (before any  
> bends),
> and another ground kit at the entrance port to the buildling/shelter.
> Polyphasers inside the shelter mounted to the the common-point  
> ground bus
> bar for all of the indoor equipment, with the indoor common-point  
> ground
> tied into the site ground system using low L/C conductors (3" Cu strap
> preferred, #2 AWG for short runs, avoiding right-angle bends).
>
>                                       --- Jeff

Amen.  You may be seated.  :-)

--
Nate Duehr
[EMAIL PROTECTED]