Here in ARCC land (arcc-inc.org) we require "re coordination" whenever
the coordinated repeater's "footprint" changes.
A change in:
Location?  Definitely!
EIRP? Yep!
HAAT? Sure thing.

License change?  Trustee change?  Call change?  Notification
(preferably in advance) from a responsible source (trustee, licensee,
"owner") will suffice most of the time.

The primary responsibility of a coordination council is to maintain
adequate co-channel isolation; predicting and avoiding interference as
much as possible.

Bill Powell - WB1GOT
ARCC VP Coordination



--- In [email protected], "w2drh" <[EMAIL PROTECTED]> wrote:
>
> I think I must be confused.  I was under the misapprehension that if
> one modified the physical location (moved the repeater), had their
> license expire, moved out of the area (where direct control of the
> repeater was not possible), or modified the system, that the
> coordination would be canceled or nullified. Am I mistaken?
>


Reply via email to