Greetings to all,
Operations have begun on the Pennsy Junction.
I have uploaded a few new photos of the railroad in the Pennsy Junction photo
album. Following "String Bob's" reporting style for FNF, here is my
description of first days ops:
A thru freight pulled into the yard's arrival track after cutting off the
caboose as a M1 pushed a freight out of town on the other mainline. the Yard
engine pulled the 3 cars for set out and added 4 empty hoppers, 2 box cars and
placed a priority piggy back car just behind the engine. The road engine then
backed the train up to the caboose, pumped air and departed, leaving the yard
engine to sort out the new cars in the 5 track classification yard.
Later that day, a thru passenger train made a stop at the 4 track passenger
station, where the yard engine added a pullman and coach to the consist before
the K4 whistled off.
Industrial traffic is negligible as the "new" industries have yet to get built
where the sidings are going to be established. And the branch line has yet to
be constructed.
Now, like "S"tring Bob and Bob Werre, I sit around and wait for the scenery
genie to arrive
Terry Dillon
Burbank CA
Switch to: Text-Only, Daily Digest • Unsubscribe • Terms of Use
.
[Non-text portions of this message have been removed]
------------------------------------
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/S-Scale/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/S-Scale/join
(Yahoo! ID required)
<*> To change settings via email:
[email protected]
[email protected]
<*> To unsubscribe from this group, send an email to:
[email protected]
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/