Subject: Progress in Mount Union
Trains ran tonight through the Mt Union upper yard (Harbison-Walker plant down to the Kistler bridge) under DCC power. That leaves about 12 feet still to equip with jumpers, plus three switches to wire. Then I tie in the already-wired Enola staging yard and the mainline is ready to roll. Lee Rainey
