Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-09-06 Thread Charles Chen
Making steady progress, but there is an issue compiling with Protobuf for
Python which I am investigating right now.

On Wed, Sep 5, 2018 at 11:13 PM Charles Chen  wrote:

> Thanks!  I talked to Boyuan who indicated that this may be an issue
> specific to the JVM version I am running, since she saw a similar issue
> while performing the 2.5.0 release.  Next step on my end is to set up
> another machine with a different JVM version to run these steps.
>
> On Wed, Sep 5, 2018 at 3:03 AM Alexey Romanenko 
> wrote:
>
>> Charles,
>> Does it happen when you run this task separately or as a part of the
>> whole project build? I run it independently and don’t see any issues on my
>> side. Also, I don’t remember that it failed on Jenkins recently. So,
>> probably this segfault is not related to exactly this task.
>>
>> On 5 Sep 2018, at 06:46, Charles Chen  wrote:
>>
>> I attempted to cut the 2.7.0 RC1 today, but encountered an issue where
>> the JVM consistently segfaulted at
>> the :beam-sdks-java-io-hadoop-input-format:test task.  I will investigate
>> further tomorrow.  Let me know if this anyone knows of this issue and has
>> any insight.
>>
>> On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré 
>> wrote:
>>
>>> It sounds good to me. I'm late on my PRs, but not release blocker
>>> anyway. I will wait the next release cycle ;)
>>>
>>> Regards
>>> JB
>>>
>>> On 29/08/2018 21:18, Charles Chen wrote:
>>> > I have cut the release branch for 2.7.0, since there continue to be no
>>> > blockers listed in JIRA.  I will build the first release candidate
>>> soon.
>>> >
>>> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen >> > > wrote:
>>> >
>>> > Hey everyone, I want to highlight again to those who missed it that
>>> > if you are aware of any 2.7.0 release blockers, you should add it
>>> as
>>> > a blocker in JIRA with a target version of 2.7.0.  It is very
>>> > helpful to know this information in advance.  As of right now,
>>> there
>>> > are no such blockers listed in JIRA, and I will be cutting the
>>> > release branch on Wednesday 8/29.
>>> >
>>> > Best,
>>> > Charles
>>> >
>>> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen >> > > wrote:
>>> >
>>> > Thanks everyone.  Again, we will proceed with the initial
>>> > release cut on August 29.
>>> >
>>> > A reminder to please tag any blocking issues as "Priority:
>>> > Blocker" and "Fix version: 2.7.0" in JIRA.  We recently
>>> > resolved https://issues.apache.org/jira/browse/BEAM-5180, and
>>> > there are no other blocking bugs at the moment.
>>> >
>>> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <
>>> g...@google.com
>>> > > wrote:
>>> >
>>> > +1 Thanks for volunteering and keeping us in schedule!
>>> >
>>> >
>>> >
>>> >
>>> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri >> > > wrote:
>>> >
>>> > +1
>>> >
>>> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
>>> > mailto:boyu...@google.com>>
>>> wrote:
>>> >
>>> > +1
>>> > Thanks for volunteering, Charles!
>>> >
>>> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
>>> > mailto:rfern...@google.com>>
>>> > wrote:
>>> >
>>> > +1, thanks for volunteering, Charles!
>>> >
>>> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
>>> > mailto:c...@google.com>>
>>> wrote:
>>> >
>>> > Thank you Andrew for pointing out my
>>> > mistake.  We should follow the calendar and
>>> > aim to cut on 8/29, not 9/7 as I
>>> incorrectly
>>> > wrote earlier.
>>> >
>>> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
>>> > Pilloud >> > > wrote:
>>> >
>>> > +1 Thanks for volunteering! The
>>> calendar
>>> > I have puts the cut date at August
>>> 29th,
>>> > which looks to be 6 weeks from when
>>> > 2.6.0 was cut. Do I have the wrong
>>> calendar?
>>> >
>>> > See:
>>> >
>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>>> >
>>> > Andrew
>>> >
>>> > On Mon, Aug 20, 2018 at 11:43 AM
>>> Connell
>>> > O'Callaghan >> > > wrote:
>>> >
>>> > +1 Charles thank you for 

Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-09-06 Thread Charles Chen
Thanks!  I talked to Boyuan who indicated that this may be an issue
specific to the JVM version I am running, since she saw a similar issue
while performing the 2.5.0 release.  Next step on my end is to set up
another machine with a different JVM version to run these steps.

On Wed, Sep 5, 2018 at 3:03 AM Alexey Romanenko 
wrote:

> Charles,
> Does it happen when you run this task separately or as a part of the whole
> project build? I run it independently and don’t see any issues on my side.
> Also, I don’t remember that it failed on Jenkins recently. So, probably
> this segfault is not related to exactly this task.
>
> On 5 Sep 2018, at 06:46, Charles Chen  wrote:
>
> I attempted to cut the 2.7.0 RC1 today, but encountered an issue where the
> JVM consistently segfaulted at
> the :beam-sdks-java-io-hadoop-input-format:test task.  I will investigate
> further tomorrow.  Let me know if this anyone knows of this issue and has
> any insight.
>
> On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré 
> wrote:
>
>> It sounds good to me. I'm late on my PRs, but not release blocker
>> anyway. I will wait the next release cycle ;)
>>
>> Regards
>> JB
>>
>> On 29/08/2018 21:18, Charles Chen wrote:
>> > I have cut the release branch for 2.7.0, since there continue to be no
>> > blockers listed in JIRA.  I will build the first release candidate soon.
>> >
>> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen > > > wrote:
>> >
>> > Hey everyone, I want to highlight again to those who missed it that
>> > if you are aware of any 2.7.0 release blockers, you should add it as
>> > a blocker in JIRA with a target version of 2.7.0.  It is very
>> > helpful to know this information in advance.  As of right now, there
>> > are no such blockers listed in JIRA, and I will be cutting the
>> > release branch on Wednesday 8/29.
>> >
>> > Best,
>> > Charles
>> >
>> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen > > > wrote:
>> >
>> > Thanks everyone.  Again, we will proceed with the initial
>> > release cut on August 29.
>> >
>> > A reminder to please tag any blocking issues as "Priority:
>> > Blocker" and "Fix version: 2.7.0" in JIRA.  We recently
>> > resolved https://issues.apache.org/jira/browse/BEAM-5180, and
>> > there are no other blocking bugs at the moment.
>> >
>> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <
>> g...@google.com
>> > > wrote:
>> >
>> > +1 Thanks for volunteering and keeping us in schedule!
>> >
>> >
>> >
>> >
>> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri > > > wrote:
>> >
>> > +1
>> >
>> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
>> > mailto:boyu...@google.com>> wrote:
>> >
>> > +1
>> > Thanks for volunteering, Charles!
>> >
>> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
>> > mailto:rfern...@google.com>>
>> > wrote:
>> >
>> > +1, thanks for volunteering, Charles!
>> >
>> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
>> > mailto:c...@google.com>> wrote:
>> >
>> > Thank you Andrew for pointing out my
>> > mistake.  We should follow the calendar and
>> > aim to cut on 8/29, not 9/7 as I incorrectly
>> > wrote earlier.
>> >
>> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
>> > Pilloud > > > wrote:
>> >
>> > +1 Thanks for volunteering! The calendar
>> > I have puts the cut date at August 29th,
>> > which looks to be 6 weeks from when
>> > 2.6.0 was cut. Do I have the wrong
>> calendar?
>> >
>> > See:
>> >
>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>> >
>> > Andrew
>> >
>> > On Mon, Aug 20, 2018 at 11:43 AM Connell
>> > O'Callaghan > > > wrote:
>> >
>> > +1 Charles thank you for taking this
>> > up and helping us maintain this
>> > schedule.
>> >
>> > On Mon, Aug 20, 2018 at 11:29 AM
>> > Charles Chen > > 

Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-09-05 Thread Alexey Romanenko
Charles,
Does it happen when you run this task separately or as a part of the whole 
project build? I run it independently and don’t see any issues on my side. 
Also, I don’t remember that it failed on Jenkins recently. So, probably this 
segfault is not related to exactly this task.

> On 5 Sep 2018, at 06:46, Charles Chen  wrote:
> 
> I attempted to cut the 2.7.0 RC1 today, but encountered an issue where the 
> JVM consistently segfaulted at the 
> :beam-sdks-java-io-hadoop-input-format:test task.  I will investigate further 
> tomorrow.  Let me know if this anyone knows of this issue and has any insight.
> 
> On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré  > wrote:
> It sounds good to me. I'm late on my PRs, but not release blocker
> anyway. I will wait the next release cycle ;)
> 
> Regards
> JB
> 
> On 29/08/2018 21:18, Charles Chen wrote:
> > I have cut the release branch for 2.7.0, since there continue to be no
> > blockers listed in JIRA.  I will build the first release candidate soon.
> > 
> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen  > 
> > >> wrote:
> > 
> > Hey everyone, I want to highlight again to those who missed it that
> > if you are aware of any 2.7.0 release blockers, you should add it as
> > a blocker in JIRA with a target version of 2.7.0.  It is very
> > helpful to know this information in advance.  As of right now, there
> > are no such blockers listed in JIRA, and I will be cutting the
> > release branch on Wednesday 8/29.
> > 
> > Best,
> > Charles
> > 
> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen  > 
> > >> wrote:
> > 
> > Thanks everyone.  Again, we will proceed with the initial
> > release cut on August 29.
> > 
> > A reminder to please tag any blocking issues as "Priority:
> > Blocker" and "Fix version: 2.7.0" in JIRA.  We recently
> > resolved https://issues.apache.org/jira/browse/BEAM-5180 
> > , and
> > there are no other blocking bugs at the moment.
> > 
> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas  > 
> > >> wrote:
> > 
> > +1 Thanks for volunteering and keeping us in schedule! 
> > 
> > 
> > 
> > 
> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri  > 
> > >> wrote:
> > 
> > +1
> > 
> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
> > mailto:boyu...@google.com> 
> > >> wrote:
> > 
> > +1
> > Thanks for volunteering, Charles!
> > 
> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
> > mailto:rfern...@google.com> 
> > >>
> > wrote:
> > 
> > +1, thanks for volunteering, Charles!
> > 
> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
> > mailto:c...@google.com> 
> > >> wrote:
> > 
> > Thank you Andrew for pointing out my
> > mistake.  We should follow the calendar and
> > aim to cut on 8/29, not 9/7 as I incorrectly
> > wrote earlier.
> > 
> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
> > Pilloud  > 
> >  > >> wrote:
> > 
> > +1 Thanks for volunteering! The calendar
> > I have puts the cut date at August 29th,
> > which looks to be 6 weeks from when
> > 2.6.0 was cut. Do I have the wrong calendar?
> > 
> > See:
> > 
> > https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
> >  
> > 
> > 
> > Andrew
> > 
> > On Mon, Aug 20, 2018 at 11:43 AM Connell
> > O'Callaghan  > 
> >  > >> wrote:
> > 
> >

Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-09-04 Thread Charles Chen
I attempted to cut the 2.7.0 RC1 today, but encountered an issue where the
JVM consistently segfaulted at
the :beam-sdks-java-io-hadoop-input-format:test task.  I will investigate
further tomorrow.  Let me know if this anyone knows of this issue and has
any insight.

On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré 
wrote:

> It sounds good to me. I'm late on my PRs, but not release blocker
> anyway. I will wait the next release cycle ;)
>
> Regards
> JB
>
> On 29/08/2018 21:18, Charles Chen wrote:
> > I have cut the release branch for 2.7.0, since there continue to be no
> > blockers listed in JIRA.  I will build the first release candidate soon.
> >
> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen  > > wrote:
> >
> > Hey everyone, I want to highlight again to those who missed it that
> > if you are aware of any 2.7.0 release blockers, you should add it as
> > a blocker in JIRA with a target version of 2.7.0.  It is very
> > helpful to know this information in advance.  As of right now, there
> > are no such blockers listed in JIRA, and I will be cutting the
> > release branch on Wednesday 8/29.
> >
> > Best,
> > Charles
> >
> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen  > > wrote:
> >
> > Thanks everyone.  Again, we will proceed with the initial
> > release cut on August 29.
> >
> > A reminder to please tag any blocking issues as "Priority:
> > Blocker" and "Fix version: 2.7.0" in JIRA.  We recently
> > resolved https://issues.apache.org/jira/browse/BEAM-5180, and
> > there are no other blocking bugs at the moment.
> >
> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas  > > wrote:
> >
> > +1 Thanks for volunteering and keeping us in schedule!
> >
> >
> >
> >
> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri  > > wrote:
> >
> > +1
> >
> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
> > mailto:boyu...@google.com>> wrote:
> >
> > +1
> > Thanks for volunteering, Charles!
> >
> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
> > mailto:rfern...@google.com>>
> > wrote:
> >
> > +1, thanks for volunteering, Charles!
> >
> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
> > mailto:c...@google.com>> wrote:
> >
> > Thank you Andrew for pointing out my
> > mistake.  We should follow the calendar and
> > aim to cut on 8/29, not 9/7 as I incorrectly
> > wrote earlier.
> >
> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
> > Pilloud  > > wrote:
> >
> > +1 Thanks for volunteering! The calendar
> > I have puts the cut date at August 29th,
> > which looks to be 6 weeks from when
> > 2.6.0 was cut. Do I have the wrong
> calendar?
> >
> > See:
> >
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
> >
> > Andrew
> >
> > On Mon, Aug 20, 2018 at 11:43 AM Connell
> > O'Callaghan  > > wrote:
> >
> > +1 Charles thank you for taking this
> > up and helping us maintain this
> > schedule.
> >
> > On Mon, Aug 20, 2018 at 11:29 AM
> > Charles Chen  > > wrote:
> >
> > Hey everyone,
> >
> > Our release calendar indicates
> > that the process for the 2.7.0
> > Beam release should start on
> > September 7.
> >
> > I volunteer to perform this
> > release and propose the
> > following schedule:
> >
> >   * We start triaging issues in
> > JIRA this week.
> >   * I will cut the initial 2.7.0
> >  

Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-29 Thread Jean-Baptiste Onofré
It sounds good to me. I'm late on my PRs, but not release blocker
anyway. I will wait the next release cycle ;)

Regards
JB

On 29/08/2018 21:18, Charles Chen wrote:
> I have cut the release branch for 2.7.0, since there continue to be no
> blockers listed in JIRA.  I will build the first release candidate soon.
> 
> On Mon, Aug 27, 2018 at 10:38 PM Charles Chen  > wrote:
> 
> Hey everyone, I want to highlight again to those who missed it that
> if you are aware of any 2.7.0 release blockers, you should add it as
> a blocker in JIRA with a target version of 2.7.0.  It is very
> helpful to know this information in advance.  As of right now, there
> are no such blockers listed in JIRA, and I will be cutting the
> release branch on Wednesday 8/29.
> 
> Best,
> Charles
> 
> On Fri, Aug 24, 2018 at 2:38 PM Charles Chen  > wrote:
> 
> Thanks everyone.  Again, we will proceed with the initial
> release cut on August 29.
> 
> A reminder to please tag any blocking issues as "Priority:
> Blocker" and "Fix version: 2.7.0" in JIRA.  We recently
> resolved https://issues.apache.org/jira/browse/BEAM-5180, and
> there are no other blocking bugs at the moment.
> 
> On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas  > wrote:
> 
> +1 Thanks for volunteering and keeping us in schedule! 
> 
> 
> 
> 
> On Thu, 23 Aug 2018 at 11:58, Udi Meiri  > wrote:
> 
> +1
> 
> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
> mailto:boyu...@google.com>> wrote:
> 
> +1
> Thanks for volunteering, Charles!
> 
> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
> mailto:rfern...@google.com>>
> wrote:
> 
> +1, thanks for volunteering, Charles!
> 
> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
> mailto:c...@google.com>> wrote:
> 
> Thank you Andrew for pointing out my
> mistake.  We should follow the calendar and
> aim to cut on 8/29, not 9/7 as I incorrectly
> wrote earlier.
> 
> On Mon, Aug 20, 2018 at 12:02 PM Andrew
> Pilloud  > wrote:
> 
> +1 Thanks for volunteering! The calendar
> I have puts the cut date at August 29th,
> which looks to be 6 weeks from when
> 2.6.0 was cut. Do I have the wrong calendar?
> 
> See:
> 
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
> 
> Andrew
> 
> On Mon, Aug 20, 2018 at 11:43 AM Connell
> O'Callaghan  > wrote:
> 
> +1 Charles thank you for taking this
> up and helping us maintain this
> schedule. 
> 
> On Mon, Aug 20, 2018 at 11:29 AM
> Charles Chen  > wrote:
> 
> Hey everyone,
> 
> Our release calendar indicates
> that the process for the 2.7.0
> Beam release should start on
> September 7.
> 
> I volunteer to perform this
> release and propose the
> following schedule:
> 
>   * We start triaging issues in
> JIRA this week.
>   * I will cut the initial 2.7.0
> release branch on September 7.
>   * After September 7, any
> blockers will need to be
> manually cherry-picked into
> the release branch.
>   * After tests pass and
> blockers are fully
>   

Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-29 Thread Charles Chen
I have cut the release branch for 2.7.0, since there continue to be no
blockers listed in JIRA.  I will build the first release candidate soon.

On Mon, Aug 27, 2018 at 10:38 PM Charles Chen  wrote:

> Hey everyone, I want to highlight again to those who missed it that if you
> are aware of any 2.7.0 release blockers, you should add it as a blocker in
> JIRA with a target version of 2.7.0.  It is very helpful to know this
> information in advance.  As of right now, there are no such blockers listed
> in JIRA, and I will be cutting the release branch on Wednesday 8/29.
>
> Best,
> Charles
>
> On Fri, Aug 24, 2018 at 2:38 PM Charles Chen  wrote:
>
>> Thanks everyone.  Again, we will proceed with the initial release cut on
>> August 29.
>>
>> A reminder to please tag any blocking issues as "Priority: Blocker" and
>> "Fix version: 2.7.0" in JIRA.  We recently resolved
>> https://issues.apache.org/jira/browse/BEAM-5180, and there are no other
>> blocking bugs at the moment.
>>
>> On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas  wrote:
>>
>>> +1 Thanks for volunteering and keeping us in schedule!
>>>
>>>
>>>
>>>
>>> On Thu, 23 Aug 2018 at 11:58, Udi Meiri  wrote:
>>>
 +1

 On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang 
 wrote:

> +1
> Thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez 
> wrote:
>
>> +1, thanks for volunteering, Charles!
>>
>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen  wrote:
>>
>>> Thank you Andrew for pointing out my mistake.  We should follow the
>>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>>
>>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud 
>>> wrote:
>>>
 +1 Thanks for volunteering! The calendar I have puts the cut date
 at August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I
 have the wrong calendar?

 See:
 https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles

 Andrew

 On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
 conne...@google.com> wrote:

> +1 Charles thank you for taking this up and helping us maintain
> this schedule.
>
> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen 
> wrote:
>
>> Hey everyone,
>>
>> Our release calendar indicates that the process for the 2.7.0
>> Beam release should start on September 7.
>>
>> I volunteer to perform this release and propose the following
>> schedule:
>>
>>- We start triaging issues in JIRA this week.
>>- I will cut the initial 2.7.0 release branch on September 7.
>>- After September 7, any blockers will need to be manually
>>cherry-picked into the release branch.
>>- After tests pass and blockers are fully addressed, I will
>>move on and perform other release tasks.
>>
>> What do you think?
>>
>> Best,
>> Charles
>>
>


Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-27 Thread Charles Chen
Hey everyone, I want to highlight again to those who missed it that if you
are aware of any 2.7.0 release blockers, you should add it as a blocker in
JIRA with a target version of 2.7.0.  It is very helpful to know this
information in advance.  As of right now, there are no such blockers listed
in JIRA, and I will be cutting the release branch on Wednesday 8/29.

Best,
Charles

On Fri, Aug 24, 2018 at 2:38 PM Charles Chen  wrote:

> Thanks everyone.  Again, we will proceed with the initial release cut on
> August 29.
>
> A reminder to please tag any blocking issues as "Priority: Blocker" and
> "Fix version: 2.7.0" in JIRA.  We recently resolved
> https://issues.apache.org/jira/browse/BEAM-5180, and there are no other
> blocking bugs at the moment.
>
> On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas  wrote:
>
>> +1 Thanks for volunteering and keeping us in schedule!
>>
>>
>>
>>
>> On Thu, 23 Aug 2018 at 11:58, Udi Meiri  wrote:
>>
>>> +1
>>>
>>> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang  wrote:
>>>
 +1
 Thanks for volunteering, Charles!

 On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez 
 wrote:

> +1, thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen  wrote:
>
>> Thank you Andrew for pointing out my mistake.  We should follow the
>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>
>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud 
>> wrote:
>>
>>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I 
>>> have
>>> the wrong calendar?
>>>
>>> See:
>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>>>
>>> Andrew
>>>
>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>> conne...@google.com> wrote:
>>>
 +1 Charles thank you for taking this up and helping us maintain
 this schedule.

 On Mon, Aug 20, 2018 at 11:29 AM Charles Chen 
 wrote:

> Hey everyone,
>
> Our release calendar indicates that the process for the 2.7.0 Beam
> release should start on September 7.
>
> I volunteer to perform this release and propose the following
> schedule:
>
>- We start triaging issues in JIRA this week.
>- I will cut the initial 2.7.0 release branch on September 7.
>- After September 7, any blockers will need to be manually
>cherry-picked into the release branch.
>- After tests pass and blockers are fully addressed, I will
>move on and perform other release tasks.
>
> What do you think?
>
> Best,
> Charles
>



Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-24 Thread Charles Chen
Thanks everyone.  Again, we will proceed with the initial release cut on
August 29.

A reminder to please tag any blocking issues as "Priority: Blocker" and
"Fix version: 2.7.0" in JIRA.  We recently resolved
https://issues.apache.org/jira/browse/BEAM-5180, and there are no other
blocking bugs at the moment.

On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas  wrote:

> +1 Thanks for volunteering and keeping us in schedule!
>
>
>
>
> On Thu, 23 Aug 2018 at 11:58, Udi Meiri  wrote:
>
>> +1
>>
>> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang  wrote:
>>
>>> +1
>>> Thanks for volunteering, Charles!
>>>
>>> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez 
>>> wrote:
>>>
 +1, thanks for volunteering, Charles!

 On Mon, Aug 20, 2018 at 12:09 PM Charles Chen  wrote:

> Thank you Andrew for pointing out my mistake.  We should follow the
> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>
> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud 
> wrote:
>
>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>> the wrong calendar?
>>
>> See:
>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>>
>> Andrew
>>
>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>> conne...@google.com> wrote:
>>
>>> +1 Charles thank you for taking this up and helping us maintain this
>>> schedule.
>>>
>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen 
>>> wrote:
>>>
 Hey everyone,

 Our release calendar indicates that the process for the 2.7.0 Beam
 release should start on September 7.

 I volunteer to perform this release and propose the following
 schedule:

- We start triaging issues in JIRA this week.
- I will cut the initial 2.7.0 release branch on September 7.
- After September 7, any blockers will need to be manually
cherry-picked into the release branch.
- After tests pass and blockers are fully addressed, I will
move on and perform other release tasks.

 What do you think?

 Best,
 Charles

>>>


Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-23 Thread Griselda Cuevas
+1 Thanks for volunteering and keeping us in schedule!




On Thu, 23 Aug 2018 at 11:58, Udi Meiri  wrote:

> +1
>
> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang  wrote:
>
>> +1
>> Thanks for volunteering, Charles!
>>
>> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez 
>> wrote:
>>
>>> +1, thanks for volunteering, Charles!
>>>
>>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen  wrote:
>>>
 Thank you Andrew for pointing out my mistake.  We should follow the
 calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.

 On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud 
 wrote:

> +1 Thanks for volunteering! The calendar I have puts the cut date at
> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
> the wrong calendar?
>
> See:
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>
> Andrew
>
> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
> conne...@google.com> wrote:
>
>> +1 Charles thank you for taking this up and helping us maintain this
>> schedule.
>>
>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen  wrote:
>>
>>> Hey everyone,
>>>
>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>> release should start on September 7.
>>>
>>> I volunteer to perform this release and propose the following
>>> schedule:
>>>
>>>- We start triaging issues in JIRA this week.
>>>- I will cut the initial 2.7.0 release branch on September 7.
>>>- After September 7, any blockers will need to be manually
>>>cherry-picked into the release branch.
>>>- After tests pass and blockers are fully addressed, I will move
>>>on and perform other release tasks.
>>>
>>> What do you think?
>>>
>>> Best,
>>> Charles
>>>
>>


Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-23 Thread Udi Meiri
+1

On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang  wrote:

> +1
> Thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez 
> wrote:
>
>> +1, thanks for volunteering, Charles!
>>
>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen  wrote:
>>
>>> Thank you Andrew for pointing out my mistake.  We should follow the
>>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>>
>>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud 
>>> wrote:
>>>
 +1 Thanks for volunteering! The calendar I have puts the cut date at
 August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
 the wrong calendar?

 See:
 https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles

 Andrew

 On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
 conne...@google.com> wrote:

> +1 Charles thank you for taking this up and helping us maintain this
> schedule.
>
> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen  wrote:
>
>> Hey everyone,
>>
>> Our release calendar indicates that the process for the 2.7.0 Beam
>> release should start on September 7.
>>
>> I volunteer to perform this release and propose the following
>> schedule:
>>
>>- We start triaging issues in JIRA this week.
>>- I will cut the initial 2.7.0 release branch on September 7.
>>- After September 7, any blockers will need to be manually
>>cherry-picked into the release branch.
>>- After tests pass and blockers are fully addressed, I will move
>>on and perform other release tasks.
>>
>> What do you think?
>>
>> Best,
>> Charles
>>
>


smime.p7s
Description: S/MIME Cryptographic Signature


Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-20 Thread Boyuan Zhang
+1
Thanks for volunteering, Charles!

On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez 
wrote:

> +1, thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen  wrote:
>
>> Thank you Andrew for pointing out my mistake.  We should follow the
>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>
>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud 
>> wrote:
>>
>>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>>> the wrong calendar?
>>>
>>> See:
>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>>>
>>> Andrew
>>>
>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>> conne...@google.com> wrote:
>>>
 +1 Charles thank you for taking this up and helping us maintain this
 schedule.

 On Mon, Aug 20, 2018 at 11:29 AM Charles Chen  wrote:

> Hey everyone,
>
> Our release calendar indicates that the process for the 2.7.0 Beam
> release should start on September 7.
>
> I volunteer to perform this release and propose the following schedule:
>
>- We start triaging issues in JIRA this week.
>- I will cut the initial 2.7.0 release branch on September 7.
>- After September 7, any blockers will need to be manually
>cherry-picked into the release branch.
>- After tests pass and blockers are fully addressed, I will move
>on and perform other release tasks.
>
> What do you think?
>
> Best,
> Charles
>



Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-20 Thread Rafael Fernandez
+1, thanks for volunteering, Charles!

On Mon, Aug 20, 2018 at 12:09 PM Charles Chen  wrote:

> Thank you Andrew for pointing out my mistake.  We should follow the
> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>
> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud 
> wrote:
>
>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>> the wrong calendar?
>>
>> See:
>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>>
>> Andrew
>>
>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan 
>> wrote:
>>
>>> +1 Charles thank you for taking this up and helping us maintain this
>>> schedule.
>>>
>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen  wrote:
>>>
 Hey everyone,

 Our release calendar indicates that the process for the 2.7.0 Beam
 release should start on September 7.

 I volunteer to perform this release and propose the following schedule:

- We start triaging issues in JIRA this week.
- I will cut the initial 2.7.0 release branch on September 7.
- After September 7, any blockers will need to be manually
cherry-picked into the release branch.
- After tests pass and blockers are fully addressed, I will move on
and perform other release tasks.

 What do you think?

 Best,
 Charles

>>>


smime.p7s
Description: S/MIME Cryptographic Signature


Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-20 Thread Charles Chen
Thank you Andrew for pointing out my mistake.  We should follow the
calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.

On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud  wrote:

> +1 Thanks for volunteering! The calendar I have puts the cut date at
> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
> the wrong calendar?
>
> See:
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles
>
> Andrew
>
> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan 
> wrote:
>
>> +1 Charles thank you for taking this up and helping us maintain this
>> schedule.
>>
>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen  wrote:
>>
>>> Hey everyone,
>>>
>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>> release should start on September 7.
>>>
>>> I volunteer to perform this release and propose the following schedule:
>>>
>>>- We start triaging issues in JIRA this week.
>>>- I will cut the initial 2.7.0 release branch on September 7.
>>>- After September 7, any blockers will need to be manually
>>>cherry-picked into the release branch.
>>>- After tests pass and blockers are fully addressed, I will move on
>>>and perform other release tasks.
>>>
>>> What do you think?
>>>
>>> Best,
>>> Charles
>>>
>>


Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-20 Thread Andrew Pilloud
+1 Thanks for volunteering! The calendar I have puts the cut date at August
29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have the
wrong calendar?

See:
https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com=America%2FLos_Angeles

Andrew

On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan 
wrote:

> +1 Charles thank you for taking this up and helping us maintain this
> schedule.
>
> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen  wrote:
>
>> Hey everyone,
>>
>> Our release calendar indicates that the process for the 2.7.0 Beam
>> release should start on September 7.
>>
>> I volunteer to perform this release and propose the following schedule:
>>
>>- We start triaging issues in JIRA this week.
>>- I will cut the initial 2.7.0 release branch on September 7.
>>- After September 7, any blockers will need to be manually
>>cherry-picked into the release branch.
>>- After tests pass and blockers are fully addressed, I will move on
>>and perform other release tasks.
>>
>> What do you think?
>>
>> Best,
>> Charles
>>
>


Re: [PROPOSAL] Prepare Beam 2.7.0 release

2018-08-20 Thread Connell O'Callaghan
+1 Charles thank you for taking this up and helping us maintain this
schedule.

On Mon, Aug 20, 2018 at 11:29 AM Charles Chen  wrote:

> Hey everyone,
>
> Our release calendar indicates that the process for the 2.7.0 Beam release
> should start on September 7.
>
> I volunteer to perform this release and propose the following schedule:
>
>- We start triaging issues in JIRA this week.
>- I will cut the initial 2.7.0 release branch on September 7.
>- After September 7, any blockers will need to be manually
>cherry-picked into the release branch.
>- After tests pass and blockers are fully addressed, I will move on
>and perform other release tasks.
>
> What do you think?
>
> Best,
> Charles
>