Re: Experience with GDDR

2016-10-14 Thread Barbara Nitz
>The minimum specs we were provided insist on a 2-CP solution, but when I
>pressed them, other than "commands took a long time", I received no
>valid reason why a single CP with sufficient memory would not be enough.
>Does anyone have experience with GDDR LPARs, specifically the CP
>requirement, and be willing to share that with a fellow Sysprog?

The two LPARs we are running both run with a single CP, and have for almost a 
year, AFAIK. No adverse effects that I could observe (but then, I don't 'do' 
hardware).

Be aware that we currently have problems terminating the GDDR address spaces 
during system shutdown that run on all systems. They need to get force arm'd to 
terminate. EMC tells us that we are behind on maintenance, I was told we have 
the maint installed, and we still need to force arm them. Go back to being 
'behind on maint' and start over.  I am getting frustrated with that. 

Barbara

--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN


Re: Experience with GDDR

2016-10-13 Thread Timothy Sipples
GDPS options are also available.


Timothy Sipples
IT Architect Executive, Industry Solutions, IBM z Systems, AP/GCG/MEA
E-Mail: sipp...@sg.ibm.com

--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN


Re: Experience with GDDR

2016-10-13 Thread Lizette Koehler
How far apart are your data centers.
Why not use SRDF/A to replicate

What benefit is EMC saying you will get from GDDR?

What storage arrays are you using? VMAX40K DataDomain

Lizette


> -Original Message-
> From: IBM Mainframe Discussion List [mailto:IBM-MAIN@LISTSERV.UA.EDU] On
> Behalf Of George Davis
> Sent: Thursday, October 13, 2016 4:12 PM
> To: IBM-MAIN@LISTSERV.UA.EDU
> Subject: Experience with GDDR
> 
> We are contemplating a move to EMC DASD, with a GDDR LPAR at both our primary
> and offsite locations.
> 
> The minimum specs we were provided insist on a 2-CP solution, but when I
> pressed them, other than "commands took a long time", I received no valid
> reason why a single CP with sufficient memory would not be enough.
> 
> Does anyone have experience with GDDR LPARs, specifically the CP requirement,
> and be willing to share that with a fellow Sysprog?
> 

--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN


Experience with GDDR

2016-10-13 Thread George Davis
We are contemplating a move to EMC DASD, with a GDDR LPAR at both our 
primary and offsite locations.


The minimum specs we were provided insist on a 2-CP solution, but when I 
pressed them, other than "commands took a long time", I received no 
valid reason why a single CP with sufficient memory would not be enough.


Does anyone have experience with GDDR LPARs, specifically the CP 
requirement, and be willing to share that with a fellow Sysprog?


--