It seems that there shouldn't be an inherent issue with CQ logic and it might 
be some projects that are not necessarily being installed via OST might not get 
built for a while and don't end up in tested.
The way to solve it to report on a specific project once it happens, so we can 
debug and the decide:
1. If its a bug in the system and fix it
2. Add a test to install that pkg in OST so CQ will fail if its not in tested
3. Decide on another action, but we need real use case to work on.

Please open an issue next time you see a project is missing from tested and 
we'll make sure to debug and see what is the best way to solve it.

> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100096)
___
Infra mailing list -- infra@ovirt.org
To unsubscribe send an email to infra-le...@ovirt.org
Privacy Statement: https://www.ovirt.org/site/privacy-policy/
oVirt Code of Conduct: 
https://www.ovirt.org/community/about/community-guidelines/
List Archives: 
https://lists.ovirt.org/archives/list/infra@ovirt.org/message/MD42QSUGBBUQTKP264QXU6DHRDOPBBWB/


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread Dafna Ron (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35977#comment-35977
 ] 

Dafna Ron commented on OVIRT-1918:
--

we monitor and report an issue once its identified. 
we do not however, report every failed change which has failed because of the 
original root cause. 

I do try to go and either re-trigger or re-merge changes if they failed cq once 
the root cause is fixed but if an issue lasts for a day or two it would be 
difficult to make sure we do not miss anything. 

maybe we need to add a warning message after an issue is fixed which lists all 
changes that need to be re-triggered or re-merged? 



> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread Barak Korren (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35975#comment-35975
 ] 

Barak Korren commented on OVIRT-1918:
-

{quote}
How a pacakge maintainer will know that a package didn't land in tested?
It tooks me 2 months to discover we have packages not getting in tested and I 
noticed just by mistake.
And I'm one of those maintainers that cares a lot about packages being 
published.
{quote}

[~dron]/infra-owner is supposed to tell you. This reporting is not fully 
automated yet because of false positives. Specifically WRT build failures you 
already get a comment in Gerrit.


> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread Barak Korren (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35974#comment-35974
 ] 

Barak Korren commented on OVIRT-1918:
-

{quote}
I'm not sure that the bisection really works then, since we have still packages 
released 2 months ago not yet landing on tested. I don't recall to have seen 
any job triggered automatically after a change-queue-tester failure doing 
bisection tests.
{quote}

It works. 'change-queue-tester' itself gets re-triggered by 'change-queue' with 
a different set of patches after failure. Only failures that were narrowed down 
to a single patch are reported to infra-list.

You can see the state of the queue an the bisection status in a graphical 
display on the status page of the  'change-queue' job.

If you see something that wasn't moved to tested it can be because:
# the HEAD itself that was tested is really broken
# some build job failed because of an infra issue (e.g s390x/fcraw issue)
# OST itself was broken at the time of the test

"ci re-merge please" is for handling the last 2 reasons, essentially [~dron] or 
the infra owner is supposed to be monitoring the CQ reports, detecting theses 
cases and issuing "ci re-merge please"  as needed.

> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread sbonazzo (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35973#comment-35973
 ] 

sbonazzo commented on OVIRT-1918:
-

bq. Maybe we need to use always the official release repo as fallback to tested?

I don't think so. Tested repo should not require official release repo.
Official release should be eventually generated from tested repo, not the other 
way around.

bq. In case a specific PKG failed to build and it's maintainer didn't make sure
bq. to fix it and redeploy, it makes sense to get missing pkgs from latest
bq. official release, as we do in OST.

How a pacakge maintainer will know that a package didn't land in tested?
It tooks me 2 months to discover we have packages not getting in tested and I 
noticed just by mistake.
And I'm one of those maintainers that cares a lot about packages being 
published.

bq. Once the maintainer of the project will build a new image and it passes, it
bq. will be in tested.

That's not always true. I had several packages that required me to issue "ci 
re-merge please" multiple times before getting to tested repo without any code 
change on the project itself.


> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread eyal edri (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35971#comment-35971
 ] 

eyal edri commented on OVIRT-1918:
--

Maybe we need to use always the official release repo as fallback to tested?

In case a specific PKG failed to build and it's maintainer didn't make sure
to fix it and redeploy, it makes sense to get missing pkgs from latest
official release, as we do in OST.

Once the maintainer of the project will build a new image and it passes, it
will be in tested.

On Mar 6, 2018 14:02, "sbonazzo (oVirt JIRA)" 
wrote:

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35970#comment-35970
]

sbonazzo commented on OVIRT-1918:

I'm not sure that the bisection really works then, since we have still
packages released 2 months ago not yet landing on tested. I don't recall to
have seen any job triggered automatically after a change-queue-tester
failure doing bisection tests.

Single project tests in change-queue-tester

 Key: OVIRT-1918
 URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
 Project: oVirt - virtualization made easy
 Issue Type: By-EMAIL
Reporter: sbonazzo
Assignee: infra

Please change change-queue-tester jobs for testing a single project at a
time (ok for multiple patches at once, but from the same project). Right
now if multiple patches are merged between a change-queue-tester execution
and the next one are done, all of them will be tested in the next run, even
if the changes are in different projects. So, supposing project A and B are
completely fine, a failure in project C can still prevent changes in A and
B to go ahead through the pipeline and get released. This cause major
headaches at least to me, requiring me to go again over all the HEAD of the
projects not being published and run yet again “ci re-merge please” again
and again and again until I'm lucky enough to have nobody else merging
patches or having all the ttested patches pass at once. I understand the
need to reduce the amount of executions of the job since it takes an hour
to execute but right now it's stealing days of execution for getting a
patch landing on t ested repo. — SANDRO BONAZZOLA ASSOCIATE MANAGER,
SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D Red Hat EMEA <
https://www.redhat.com/>  TRIED. TESTED. TRUSTED. <
https://redhat.com/trusted>

— This message was sent by Atlassian Jira (v1001.0.0-SNAPSHOT#100081)



> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


Re: [JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread Eyal Edri
Maybe we need to use always the official release repo as fallback to tested?

In case a specific PKG failed to build and it's maintainer didn't make sure
to fix it and redeploy, it makes sense to get missing pkgs from latest
official release, as we do in OST.

Once the maintainer of the project will build a new image and it passes, it
will be in tested.

On Mar 6, 2018 14:02, "sbonazzo (oVirt JIRA)" 
wrote:

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35970#comment-35970
]

sbonazzo commented on OVIRT-1918:

I'm not sure that the bisection really works then, since we have still
packages released 2 months ago not yet landing on tested. I don't recall to
have seen any job triggered automatically after a change-queue-tester
failure doing bisection tests.

Single project tests in change-queue-tester

 Key: OVIRT-1918
 URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
 Project: oVirt - virtualization made easy
 Issue Type: By-EMAIL
Reporter: sbonazzo
Assignee: infra

Please change change-queue-tester jobs for testing a single project at a
time (ok for multiple patches at once, but from the same project). Right
now if multiple patches are merged between a change-queue-tester execution
and the next one are done, all of them will be tested in the next run, even
if the changes are in different projects. So, supposing project A and B are
completely fine, a failure in project C can still prevent changes in A and
B to go ahead through the pipeline and get released. This cause major
headaches at least to me, requiring me to go again over all the HEAD of the
projects not being published and run yet again “ci re-merge please” again
and again and again until I'm lucky enough to have nobody else merging
patches or having all the ttested patches pass at once. I understand the
need to reduce the amount of executions of the job since it takes an hour
to execute but right now it's stealing days of execution for getting a
patch landing on t ested repo. — SANDRO BONAZZOLA ASSOCIATE MANAGER,
SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D Red Hat EMEA <
https://www.redhat.com/>  TRIED. TESTED. TRUSTED. <
https://redhat.com/trusted>

— This message was sent by Atlassian Jira (v1001.0.0-SNAPSHOT#100081)

___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread sbonazzo (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35970#comment-35970
 ] 

sbonazzo commented on OVIRT-1918:
-

I'm not sure that the bisection really works then, since we have still packages 
released 2 months ago not yet landing on tested. I don't recall to have seen 
any job triggered automatically after a change-queue-tester failure doing 
bisection tests.

> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread Barak Korren (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35969#comment-35969
 ] 

Barak Korren edited comment on OVIRT-1918 at 3/6/18 10:55 AM:
--

{quote}
So, supposing project A and B are completely fine, a failure in project C
can still prevent changes in A and B to go ahead through the pipeline and
get released.
{quote}

This statement is false - what will happen in this case is that a bisection 
search will run and isulate the change to project C, while allowing the changes 
for A and B to pass. This si the whole point of CQ and the difference between 
it and the 'experimental' system it replaced.

[~sbona...@redhat.com] Unless you need further clarification, I will close this 
ticket as WONTFIX.


was (Author: bkor...@redhat.com):
{quote}
So, supposing project A and B are completely fine, a failure in project C
can still prevent changes in A and B to go ahead through the pipeline and
get released.
{quote}

This statement is false - what will happen in this case is that a bisection 
search will run and isulate the change to project C, while allowing the changes 
for A and B to pass. This si the whole point of CQ and the difference between 
it and the 'experimental' system it replaced.

[~sbona...@redhat.com] Un;ess you need further clarification, I will close this 
ticket as WONTFIX.

> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread Barak Korren (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35969#comment-35969
 ] 

Barak Korren edited comment on OVIRT-1918 at 3/6/18 10:56 AM:
--

{quote}
So, supposing project A and B are completely fine, a failure in project C
can still prevent changes in A and B to go ahead through the pipeline and
get released.
{quote}

This statement is false - what will happen in this case is that a bisection 
search will run and isulate the change to project C, while allowing the changes 
for A and B to pass. This is the whole point of CQ and the difference between 
it and the 'experimental' system it replaced.

[~sbona...@redhat.com] Unless you need further clarification, I will close this 
ticket as WONTFIX.


was (Author: bkor...@redhat.com):
{quote}
So, supposing project A and B are completely fine, a failure in project C
can still prevent changes in A and B to go ahead through the pipeline and
get released.
{quote}

This statement is false - what will happen in this case is that a bisection 
search will run and isulate the change to project C, while allowing the changes 
for A and B to pass. This si the whole point of CQ and the difference between 
it and the 'experimental' system it replaced.

[~sbona...@redhat.com] Unless you need further clarification, I will close this 
ticket as WONTFIX.

> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread Barak Korren (oVirt JIRA)

[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-1918?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=35969#comment-35969
 ] 

Barak Korren commented on OVIRT-1918:
-

{quote}
So, supposing project A and B are completely fine, a failure in project C
can still prevent changes in A and B to go ahead through the pipeline and
get released.
{quote}

This statement is false - what will happen in this case is that a bisection 
search will run and isulate the change to project C, while allowing the changes 
for A and B to pass. This si the whole point of CQ and the difference between 
it and the 'experimental' system it replaced.

[~sbona...@redhat.com] Un;ess you need further clarification, I will close this 
ticket as WONTFIX.

> Single project tests in change-queue-tester
> ---
>
> Key: OVIRT-1918
> URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
> Project: oVirt - virtualization made easy
>  Issue Type: By-EMAIL
>Reporter: sbonazzo
>Assignee: infra
>
> Please change change-queue-tester jobs for testing a single project at a
> time (ok for multiple patches at once, but from the same project).
> Right now if multiple patches are merged between a change-queue-tester
> execution and the next one are done, all of them will be tested in the next
> run, even if the changes are in different projects.
> So, supposing project A and B are completely fine, a failure in project C
> can still prevent changes in A and B to go ahead through the pipeline and
> get released.
> This cause major headaches at least to me, requiring me to go again over
> all the HEAD of the projects not being published and run yet again "ci
> re-merge please" again and again and again until I'm lucky enough to have
> nobody else merging patches or having all the ttested patches pass at once.
> I understand the need to reduce the amount of executions of the job since
> it takes an hour to execute but right now it's stealing days of execution
> for getting a patch landing on tested repo.
> -- 
> SANDRO BONAZZOLA
> ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D
> Red Hat EMEA 
> 
> TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra


[JIRA] (OVIRT-1918) Single project tests in change-queue-tester

2018-03-06 Thread sbonazzo (oVirt JIRA)
sbonazzo created OVIRT-1918:
---

 Summary: Single project tests in change-queue-tester
 Key: OVIRT-1918
 URL: https://ovirt-jira.atlassian.net/browse/OVIRT-1918
 Project: oVirt - virtualization made easy
  Issue Type: By-EMAIL
Reporter: sbonazzo
Assignee: infra


Please change change-queue-tester jobs for testing a single project at a
time (ok for multiple patches at once, but from the same project).

Right now if multiple patches are merged between a change-queue-tester
execution and the next one are done, all of them will be tested in the next
run, even if the changes are in different projects.
So, supposing project A and B are completely fine, a failure in project C
can still prevent changes in A and B to go ahead through the pipeline and
get released.
This cause major headaches at least to me, requiring me to go again over
all the HEAD of the projects not being published and run yet again "ci
re-merge please" again and again and again until I'm lucky enough to have
nobody else merging patches or having all the ttested patches pass at once.

I understand the need to reduce the amount of executions of the job since
it takes an hour to execute but right now it's stealing days of execution
for getting a patch landing on tested repo.

-- 

SANDRO BONAZZOLA

ASSOCIATE MANAGER, SOFTWARE ENGINEERING, EMEA ENG VIRTUALIZATION R&D

Red Hat EMEA 

TRIED. TESTED. TRUSTED. 



--
This message was sent by Atlassian Jira
(v1001.0.0-SNAPSHOT#100081)
___
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra