Re: [PEDA] Test points

2004-06-03 Thread Tom Reineking
Thanks Ian for the information. I was concerned about the grid also. I'll add the testpoint component to the schematics which will give me more flexibility. Thanks again. Tom Ian Wilson wrote: On 08:06 AM 3/06/2004, Tom Reineking said: .. 4 hours later ... Just got my post back and I did

[PEDA] Test points

2004-06-02 Thread Tom Reineking
I have a fairly complex BGA design that requires via tenting, at least on the component side. The PCB assembly will not go through wave solder, so no problem with the solder side. There are two problems I have run into. The first is tenting on one side. I checked the KB and only DXP and up

Re: [PEDA] Test points

2004-06-02 Thread Tom Reineking
.. 4 hours later ... Just got my post back and I did find an answer to the report part concerning nets without testpoints. The design rule Testpoint Usage does generate violations for those nets and therefore a report can be generated. There is also a document on the Protel web site in the

Re: [PEDA] Test points

2004-06-02 Thread Ian Wilson
On 08:06 AM 3/06/2004, Tom Reineking said: .. 4 hours later ... Just got my post back and I did find an answer to the report part concerning nets without testpoints. The design rule Testpoint Usage does generate violations for those nets and therefore a report can be generated. There is also

[PEDA] test points

2001-10-01 Thread Brad Marshall
Hello, I have a design that is completed, all routed, and the engineer has decided he wants test points on every net on the bottom side. Is there an easy way of doing this besides by hand from net to net? Thanks, Brad Marshall * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * To