Re: [psas-avionics] GFE connection terminals

2010-09-23 Thread Jeremy Booth
Pushed the current state of the GFE. There's several traces to be run still, and a few other details (which should be in the commit notes) but it is pretty together. -Jeremy On Sat, Sep 18, 2010 at 6:55 PM, Andrew Greenberg wrote: > Hi Jeremy, > > We'll be running the board at Sunstone, so on

Re: [psas-avionics] GFE connection terminals

2010-09-18 Thread Andrew Greenberg
Hi Jeremy, We'll be running the board at Sunstone, so on a four layer board, that's a design rule of 6 mil trace/6 mil space and a minimum drill size of 8 mils. Of course, you should avoid the 6 mil rule as much as possible, and make things bigger and farther apart, but it's just fine to use the

[psas-avionics] GFE connection terminals

2010-09-18 Thread Jeremy Booth
It came up that we should have vias instead of the tiny pads as connection points for board backends off the GFE. There was some talk about drill size and wire gauge, but I don't know that we came to a specific drill size, and I don't recall the gauge of the wire that was discussed... anyone have