I am getting rusty on my battery knowledge as I rarely work with them
anymore, so here's a few questions for you battery gurus out there. In
back-up systems with flooded batteries, I've always been told it's good to
put them through several charge/discharge cycles when they are new to
achieve
Kent,
Yes, that is the drawing of a typical installation.
Regards,
Brian
Brian Faley
Chief Engineer
Magnum Energy
2111 W Casino Rd
Everett, WA 98204
425-353-8833
bfa...@magnumenergy.com
From: re-wrenches-boun...@lists.re-wrenches.org
Wrenches,
I am installing Lumeta peel and stick modules (similar to laminates) on a
flat EPDM roof. No racking. NEC2008 690.31(B) says single conductor cable
listed and labeled as PV wire shall be permitted in exposed outdoor
locations...within the array. 690.2 defines array as a mechanically
Wrenches,
Just installed a Magnum MS-PAE battery based system on an E-Panel distribution
box and my inspector seems to have an issue with the grounding. He is saying
that I must run an additional GEC down to the ground rod because I am dealing
with two separate grounding systems. The DC
The idea of within the array goes to the idea that the conductors will be
located on the underside of an array of traditional framed moduled and will
be afforded a modicum of protection from physical damage by the module
itself.
So the issue is one of physical protection of the conductors. That
Lumeta dealer has been sending links for unlisted wire management systems,
nothing from Lumeta itself. Cooper B-Line EnviroShield is listed and is an
easier drop in raceway but very expensive.
On Tue, Sep 6, 2011 at 4:02 PM, Mark Frye ma...@berkeleysolar.com wrote:
**
The idea of within the
Aaron,
I am still back at NEC 2008 on this but see 690.47 (C), especially (3) ..a
single conductor shall be permitted to be used to perform the multiple
functions of dc grounding, ac grouding,.(5) a common buss bar shall be
permitted to be used for both systems (6) a common grounding
I think 690.47 C 3 covers this in the new 2011 code. The info notes 1
2 also yield more clarification. As always confusion reins until we get
some actual interpretation from Bill Brooks or John Wiles, as all of
this was completely rewritten. Feel free to correct me, any and
everyone, but this
8 matches
Mail list logo