13D UG flush

2022-03-03 Thread Rocci 3 Cetani via Sprinklerforum
We have a contractor that is refusing to flush the UG pipe prior to tie in because he "has never done it in 20 years". I can find something in NFPA 13R that requires a flush but nothing in 13D.. Anyone have any insight on why its not required in 13D? Rocci Cetani III, CET Senior Designer W

RE: going paperless

2021-11-18 Thread Rocci 3 Cetani via Sprinklerforum
separate sheets and taking out graphics on forms. Taylor Schumacher -Original Message- From: Sprinklerforum On Behalf Of Rocci 3 Cetani via Sprinklerforum Sent: Wednesday, November 17, 2021 5:22 PM To: sprinklerforum@lists.firesprinkler.org Cc: Rocci 3 Cetani ; Fpdcdesign Subject: RE

RE: going paperless

2021-11-17 Thread Rocci 3 Cetani via Sprinklerforum
Todd, We want them to be able to mark up changes on plans ( they will still have a paper copy of plans) but on projects that are congested and 1/8" scale we want them to be able to zoom in for clarification. We also want to be able to load all of our forms on there so they can do paper work st

RE: going paperless

2021-11-17 Thread Rocci 3 Cetani via Sprinklerforum
77d19bafe511-257C0-257C0-257C636379016677342180-26sdata-3DeGdMZGu2wXhUupGwgGTrqF3b54OP5-252BAZvlHhABSexWY-253D-26reserved-3D0&d=DwICAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hLXh1DXRDwJ3oz4y7iNesSsetYhUUV0wawfPGfwmYxQ&m=-a9TTSMWkj7wLyyL4EuRnaT_bY4FzgE4SWLFKw0yORU&s=I65Ynl8ZAVrcl0th

going paperless

2021-11-17 Thread Rocci 3 Cetani via Sprinklerforum
Ok hopefully this is allowed, if not I apologize. So our company is in the process of going paperless and we are trying to find software (compatible with iPads) where we can share files/plans between the office staff and our fitters. We would like to have them be able to edit the files or ma

FDC signs

2020-08-17 Thread Rocci 3 Cetani via Sprinklerforum
NFPA 13 8.17.2.4.7.1 says the lettering needs to be at least 1" in height on plate or fitting reading service design. Is this just referring to "FDC AUTOSPRINK" or should every letter on the sign (address) be min. 1" in height? Rocci Cetani III, CET Senior Designer Water-Based Fire Protections S

RE: Missing hydraulic data plates

2020-08-10 Thread Rocci 3 Cetani via Sprinklerforum
We run into this all the time, we have a code interpretation from the state fire marshal (California) stating a system is deficient if its missing it. Rocci Cetani III, CET Senior Designer Water-Based Fire Protections Systems Layout, Nicet Level III Northern California Fire Protection Services

RE: Floor Mounted Vertical Obstructions

2020-07-14 Thread Rocci 3 Cetani via Sprinklerforum
I don't see a 12.1.11.2.2 But for a floor mounted obstruction you should be using figure 8.10.6.2.2 Rocci Cetani III, CET Senior Designer Water-Based Fire Protections Systems Layout, Nicet Level III Northern California Fire Protection Services Inc. 16840 Joleen Way Bldg. A Morgan Hill, CA 93037

RE: I-B construction - ABS plumbing piping

2020-05-19 Thread Rocci 3 Cetani via Sprinklerforum
Only problem is its vague and I think the committee did that on purpose. “minor quantities” is up for too much interpretation Rocci Cetani III, CET Senior Designer Water-Based Fire Protections Systems Layout, Nicet Level III Northern California Fire Protection Services Inc. 16840 Joleen Way Bld

RE: Misc. Storage

2020-01-30 Thread Rocci 3 Cetani via Sprinklerforum
This one is intriguing to me If chapter 13 designates it an OH2 shouldn't a system be allowed to be @ 52,000 sqft regardless of rack storage? Rocci Cetani III, CET Senior Designer Water-Based Fire Protections Systems Layout, Nicet Level III Northern California Fire Protection Services Inc. 1