Reliable Power

2012-07-02 Thread Failla, Daniel
=2127.html -- next part -- An HTML attachment was scrubbed... URL: http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120702/af9701b3/attachment.html ___ Sprinklerforum mailing list Sprinklerforum

RE: Reliable Power

2012-07-02 Thread Craig.Prahl
-- next part -- An HTML attachment was scrubbed... URL: http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120702/af9701b3/attachment.html ___ Sprinklerforum mailing list Sprinklerforum@firesprinkler.org http

Head replacement on pipe sched

2012-07-02 Thread Todd - FPDC
I am recommending replacing all of the sprinklers on a pipe schedule system in a school. SR or QR heads? Sent from my iPhone ___ Sprinklerforum mailing list Sprinklerforum@firesprinkler.org

RE: Reliable Power

2012-07-02 Thread Bruce Verhei
was scrubbed... URL: http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120702/af9701b3/attachment.html ___ Sprinklerforum mailing list Sprinklerforum@firesprinkler.org http://fireball.firesprinkler.org/mailman/listinfo

RE: Reliable Power

2012-07-02 Thread Craig.Prahl
-- next part -- An HTML attachment was scrubbed... URL: http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120702/af9701b3/attachment.html ___ Sprinklerforum mailing list Sprinklerforum@firesprinkler.org http

RE: Head replacement on pipe sched

2012-07-02 Thread Morey, Mike
/sprinklerforum -- next part -- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 3923 bytes Desc: not available URL: http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120702/d471fc4f/attachment.bin

Re: Head replacement on pipe sched

2012-07-02 Thread George Church
was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 3923 bytes Desc: not available URL: http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120702/d471fc4f/attachment.bin ___ Sprinklerforum mailing list

Re: Head replacement on pipe sched

2012-07-02 Thread Roland Huggins
I think your asking if it is acceptable to convert an existing pipe schedule with standard response sprinklers to quick response sprinklers. Although you aren't required too change them since it is existing, if I were you AND the sprinklers were going to be changed anyways, I'd go that

Re: Head replacement on pipe sched

2012-07-02 Thread Todd Williams
This is a dry system installed in 1899. The current sprinklers are from 1954 (+/-) and are being replaced due to age. FWIW, we did an internal inspection and are going to do a full flushing as well. At 03:19 PM 7/2/2012, you wrote: I think your asking if it is acceptable to convert an

Reliable Power

2012-07-02 Thread å . . . . . . .
It might be consdidered that areas prone to unacceptably high risk to electrical failure (e.g. tsunami, earthquaqe, flood, volcano, avalanche, corrosion, lightning, even vandalism, etc.) should take these natural or 'environmental' disasters into consideration as to whether a provided electrical

RE: Reliable Power

2012-07-02 Thread George Church
Some good points, but I wouldn't hold my breath on reading the reality posted in a public spot. Even the family of a US Govt employee who was killed my US-govt issued armament, let alone Congress, can't get a straight answer on how that happened. While I'd love to see the summary of a lot of

Re: Reliable Power

2012-07-02 Thread John Drucker
: www.charleston-sc.gov/dept/content.aspx?nid=2127.htmlhttp://www.charleston-sc.gov/dept/content.aspx?nid=2127.html -- next part -- An HTML attachment was scrubbed... URL: http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120702/af9701b3/attachment.html