Hi Remi,

I was reading this draft and one sentence in the abstract drew my attention:

To cope with the IPv4 address shortage, customers can be
   assigned IPv4 addresses with restricted port sets.

I think this means A+P at the customer level.

I was under the impression that A+P use in 4rd was restricted to the CE level.

As you know A+P has limitations, i.e. it can not be used on shared
links such as 802.3 or 802.11.
I am not sure if it is mentioned in the draft.

I thought this feature was not in draft-despres-softwire-4rd-00 at
least the above sentence is not in the abstract.

Have you attended 2009 BoF on A+P?
There the message was clear: do not use A+P at the customer level.

What is the point of bringing it back? 4rd does it or does it not
already help in IPv4 address shortage?

Regards,

Behcet
_______________________________________________
Softwires mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/softwires

Reply via email to