Hi Suresh, all,

I'm OK with all the milestones, except the one to conclude the WG. I do think 
it is safe to schedule it for end 2016. 

I would like to see covered under the YANG data model milestone not only A+P 
related DMs (i.e., draft-sun-softwire-yang) but also DS-Lite YANG data model (a 
candidate document is available at: 
https://datatracker.ietf.org/doc/draft-boucadair-softwire-dslite-yang/).  

I'm also supportive of having an item for "RADIUS Extensions for IPv4-Embedded 
Multicast and Unicast IPv6 Prefixes".

Cheers,
Med

> -----Message d'origine-----
> De : Softwires [mailto:[email protected]] De la part de Suresh
> Krishnan
> Envoyé : mercredi 14 octobre 2015 01:14
> À : Softwires WG
> Cc : Yong Cui
> Objet : [Softwires] Milestone update and closing/rechartering discussion
> 
> Hi all,
>    As we mentioned in the last meeting we are trying to wind down the
> softwire working group in an orderly fashion and trying to make sure
> that no essential documents are left out.
> 
> Milestones update
> =================
> 
> To start off we would like to update the milestones for the open
> deliverables. If you think that the timelines are off or if you think
> any of these deliverables are not needed, please feel to speak up.
> 
> Nov 2015    Submit MAP RADIUS attribute document for Proposed Standard
>              (decide whether to include lw4o6 or not)
> 
> Nov 2015    Submit MAP MIB module document for Proposed Standard
> 
> Nov 2015    Adopt MAP-T deployment scenarios as a WG document
>              (Already adopted as wg item earlier. Reconfirm)
> 
> Dec 2015    Submit Mesh topology multicast document as Proposed Standard
> 
> Dec 2015    Submit DS-lite multicast document for Proposed Standard
> 
> Jan 2016    Submit multicast prefix option document as Proposed Standard
> 
> Jan 2016    Submit MAP deployment document as Informational
> 
> Mar 2016    Submit softwire YANG model document for Proposed Standard
> 
> Mar 2016    Submit Unified Softwire CPE document for Proposed Standard
> 
> Mar 2016    Submit MAP-T deployment scenarios for Informational
> 
> Apr 2016    Conclude WG
> 
> 
> Potential items for new milestones: Part 1
> ==========================================
> 
> There are also some drafts (or draft ideas) that have seen some support
> at the meetings when they were presented or discussed. We would like to
> gauge the support for these drafts before we add them to the milestones.
> 
> Softwire YANG model draft
> draft-sun-softwire-yang-04
> 
> Dynamic IPv4 Provisioning for Lightweight 4over6
> draft-liu-softwire-lw4over6-dynamic-provisioning-00
> 
> Lightweight 4over6 operational document
> (Idea floated - no current draft)
> 
> 
> Potential items for rechartering: Part 2
> ========================================
> 
> There are also a few other drafts that have been presented and the
> authors have requested that they be included in the rechartering process
> (if there is one). Similar to the items in Part 1, we would like to
> gauge the support for these drafts as well before we decide to work on
> them.
> 
> RADIUS Extensions for IPv4-Embedded Multicast and Unicast IPv6 Prefixes
> draft-hu-softwire-multicast-radius-ext-08
> 
> Multicast Support for Mapping of Address and Port Protocol and Light
> Weight 4over6
> draft-sarikaya-softwire-map-multicast-04
> 
> There are also a few other drafts floating around that could be of
> potential interest to softwires. If you feel that there are other drafts
> that need to be considered, feel free to propose them here as well. If
> we see a very strong need for a recharter we will work with the ADs to
> decide on the further steps.
> 
> Thanks
> Suresh
> 
> _______________________________________________
> Softwires mailing list
> [email protected]
> https://www.ietf.org/mailman/listinfo/softwires

_______________________________________________
Softwires mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/softwires

Reply via email to