NFPA 14 requires "an additional 2 1/2" hose connection" at the highest
landing (if stairs go up to the roof) or at the roof, at the hydraulically
most remote standpipe riser to facilitate testing of the system. I've never
seen an additional hose connection being provided. I've been told by
contractors that the hose connection at the highest floor level can be used
for this purpose, which would be a difficult task as most buildings don't
have access to the roof.

What is the normal practice out there?

Tony