Your RIGHT! Because the sprinkler contractor is now the only one that does
his layout in 3D he visualizes all of the problems the others call "Field
Conditions".
Architects get really pissed off when you point out that they and their
consultants didn't co-ordinate space above the ceiling even with their own
structural engineer. Yeah the ceiling to bottom of floor is 36", and there
are recessed lights in the ceiling with lenses that make them 8" deep. And
yes you clearly show the 16x30 duct, and the cable tray and our main is only
6", so what's your problem? COULD IT POSSABLY BE THAT W30 beam we're all
shown crossing?

Since ancient times the builder of empires and Architects have had the same
theory, KILL the messenger!!

Thom McMahon, SET
Firetech, Inc.
2560 Copper Ridge Dr
P.O. Box 882136
Steamboat Springs, CO 80488
Tel:  970-879-7952
Fax: 970-879-7926


-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Todd Williams
- FPDC
Sent: Wednesday, November 12, 2008 10:59 AM
To: [email protected]
Subject: RE: design and coordination roles and responsibilities.

One of the consistent problems we have up here is the electrician. 
They don't take part in the coordination process, they often don't even have
CAD drawings and they just run everything where they want. 
And the GC's tend to let them get away with a lot of it. I find that more
problems with the architect's concepts surface in the sprinkler design that
any of the other trades.


_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [EMAIL PROTECTED]

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to