3D coordination is right where sprinkler design software was 12-15 years
ago - an emerging technology.   As a consultant firm that does a lot of
work with architectural clients, we are being asked more and more to
draw in 3D or have 3D capability; its use so far has been primarily as a
coordination tool by the construction teams working off of our design
teams' documents.   As such, we still haven't made a binding commitment
to Revit or any other particular program, and Navis remains the
coordination platform of choice because you can easily load conventional
2D CAD files and make it spin.  

Speaking just for myself and based on our experiences to date, I would
characterize 3D as purely a garbage-in-garbage-out exercise.   We have a
large and very complicated hospital project in construction now, a
3-floor tenant improvement for which the scope of sprinkler work is to
add drops to existing shell branch piping installed about 4 years ago.
The work was "coordinated" in 3D by a "3D consultant".   Which means two
skateboarders with Cheetos stains on their fingers in this case.   They
identified countless "conflicts" that weren't and missed several others
that were, leading to dozens of hours of paperwork for both design and
construction team members to sort out RFI's, sketches and field
conditions.   It was, in a word, a FIASCO.   We have another much
smaller project, also going into construction, where we and the other
trades have managed to thread the needle in several exceptionally tight
situations and it has gone smoothly.  Not surprisingly, this work was
managed by one of the subs, and not by an outside "consultant" (insert
self-deprecating joke HERE). 

It is unquestionably the platform of the future and when used by a
knowledgeable technician can be a powerful tool.   But there's a
honeymoon period that we need to move on from, in which certain
opportunistic engineers and CAD technicians are representing their
services as something more - sometimes much more - than they can
actually deliver.

Steve Leyton
Protection Design & Consulting
San Diego, CA


-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of GAYLE
KNOWLES
Sent: Tuesday, November 11, 2008 10:57 AM
To: sprinklerforum
Subject: RE: White papers and definition of roles


that's right, what Ron said.  And besides the fact, we all know where
the design problems are in all the different constructions and
occupancies when we prepare our bids.  The 3D is great if everyone sits
done at the table during the construction meetings and signs off on
coordination drawings showing elevations etc.  Doesn't do much good in
bidding, when the electrician decides to run his cable trays wherever he
wants after the fact. If your bid is that tight, counting on the
electrician to run his trays "as shown conceptually", you are out of
luck.> 

Date: Tue, 11 Nov 2008 11:13:32 -0700> 
From: [EMAIL PROTECTED]> To: [email protected]> 
Subject: RE: White papers and definition of roles> > 

Right on George. With all the special systems I would expect more than>
$2k difference in the specialty equipment quotes and the prices should>
be closer if you take away the opportunity for innovation of design by>
the bidders.> > Our prices are higher on jobs requiring 3D or BIM. We
find there is very> little coordination and more "here is where we are
so now you> (sprinkler) can go around us. It's like a 3D retrofit. The
only thing> that changes is we spend more design time to come up with
the same> product. Besides we FP contractors have been doing 3D since
the> beginning of time, it's just that the presentation has been 2D.

 

__________ Information from ESET NOD32 Antivirus, version of virus
signature database 3603 (20081111) __________

The message was checked by ESET NOD32 Antivirus.

http://www.eset.com
 
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [EMAIL PROTECTED]

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to