Thanks... That's kind of what I expected to see.

I'm wondering now, would this be worth the price (of development, 
deployment) to have this
info down to the piping level of a sprinkler system?

Most of bim that I've seen answers one question - did I hit anything?
And a lot of drawings are being coordinated on that basis alone 
(here's where I wanna run, why can't I ?).

Any other thinking along this line?

At 11:32 AM 5/24/2010, you wrote:
>For a sprinkler system in a real Bldg. Information Model you would 
>be able to click on a sprinkler pipe and be referred to additional 
>information which could include
>the contractor installation drawings, system calculations, 
>equipment/component shop drawings, testing records, activation or 
>repair records, basically anything related to the installation or operation

Vince Sabolik
Christi Fire Protection, Inc.
11351 Pearl Road
Strongsville, Ohio 44136

T 440 572-7730  F 440 572-7719  Email: 
<mailto:[email protected]>[email protected]

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to